MAINTENANCE
SDX-102 05/19
Maintenance Section 5-7
© 2019 Alamo Group Inc.
MAINTENANCE
7. Install the four 3/8” bolts and lock washers that
your prepared with locktite© in step 5. Tighten
all four bolts.
8. Install cone over the spline shaft of the Reducer
Box.
9. Replace all shielding before operation of the
machine.
Summary of Contents for SDX-102
Page 4: ......
Page 7: ...Safety Section 1 1 2019 Alamo Group Inc SAFETY SECTION ...
Page 21: ...SAFETY SDX 102 05 19 Safety Section 1 15 2019 Alamo Group Inc SAFETY Decal Location ...
Page 23: ...SAFETY SDX 102 05 19 Safety Section 1 17 2019 Alamo Group Inc SAFETY Decal Description ...
Page 24: ...SAFETY SDX 102 05 19 Safety Section 1 18 2019 Alamo Group Inc SAFETY ...
Page 25: ...SAFETY SDX 102 05 19 Safety Section 1 19 2019 Alamo Group Inc SAFETY ...
Page 26: ...SAFETY SDX 102 05 19 Safety Section 1 20 2019 Alamo Group Inc SAFETY ...
Page 27: ...SAFETY SDX 102 05 19 Safety Section 1 21 2019 Alamo Group Inc SAFETY ...
Page 28: ...SAFETY SDX 102 05 19 Safety Section 1 22 2019 Alamo Group Inc SAFETY ...
Page 29: ...SAFETY SDX 102 05 19 Safety Section 1 23 2019 Alamo Group Inc SAFETY ...
Page 30: ...SAFETY SDX 102 05 19 Safety Section 1 24 2019 Alamo Group Inc SAFETY ...
Page 32: ......
Page 33: ...Introduction Section 2 1 2019 Alamo Group Inc INTRODUCTION SECTION ...
Page 36: ......
Page 37: ... 2019 Alamo Group Inc ASSEMBLY SECTION ...
Page 42: ......
Page 43: ...Operation Section 4 1 2019 Alamo Group Inc OPERATION SECTION ...
Page 82: ......
Page 83: ...Maintenance Section 5 1 2019 Alamo Group Inc MAINTENANCE SECTION ...
Page 100: ......
Page 103: ......
Page 104: ...SDX 102 05 19 Part No B102 010C Printed Canada ...