I
NSTALLATION
T
OWER VERSION
This chapter describes the operations required to prepare the BATTERY BOX for use in the
tower version.
WARNING: for your safety and that of your product, follow the information set out below
exactly.
BEFORE CARRYING OUT THE FOLLOWING SEQUENCE OF OPERATIONS, ENSURE
THAT THE BATTERY BOX IS NOT CONNECTED TO THE ELECTRICITY MAINS, TO
THE UPS OR TO ANY OTHER BATTERY BOXES
Once removed from the packaging, the BATTERY BOX is ready for installation in tower
configuration.
All that is needed to complete this configuration is to mount the 3 plastic covers provided in
the upper part of the BATTERY BOX, as described below:
The 3 covers have an interlocking system:
locate the cover mounting holes in the upper part
of the BATTERY BOX and very carefully engage
them by exerting gentle pressure (see figure at
side).
Summary of Contents for GENIO Dual Maxi Series
Page 15: ...page 15...
Page 16: ...MAN_USBB240A3 USBC240xx_EN_2011_03 doc 0MNSDL240NP5LUA...