background image

 
 

Installation 

 

Page 7 of 10 

Create date 22.02.2019 

en

 

Installation 

The work described in the following must be executed by an electrical engineer only. 

To protect the device from damage, we recommend a fault current monitoring device shall be 

provided.

 

 

TT- and TN systems

: A fault current protection device should be installed. The calculation value of the 

fault current must be set during commissioning. 

IT system

: An isolation control device has to be used, which interrupts the supply whenever the 

insulation resistance amounts to no more than 50 Ohm/V, related to the calculation tension. 

 

 

The supply voltage must correspond to the voltage indicated on the type plate.  

 

For the selection of the cross-sections for connection, loads, fusing etc. the relevant legal 

requirements must be observed (see a. o. VDE 0100, VDE 0298-4).  

 

 

Electrical connection 

1. 

Unscrew the cover. 

2. 

Insert the cables through the cable glands into the connection head. 

3. 

Tighten the nut of the cable gland to guarantee the strain relief and the protection mode. 

(Cables and cable glands must be matched to guarantee the required protection mode.) 

4. 

Connect cable according to the wiring diagram. 

5. 

Check connections for tight fit. 

6. 

Screw on cover. 

 

Summary of Contents for 20153106330140

Page 1: ...ber 20153106330140 Cartridge type heater Type 93 F53 63 Output W 1 000 Output tolerant 5 10 Voltage 400V 2 Schniewindt GmbH Co KG Sch ntaler Weg 46 58809 Neuenrade Germany Phone 49 2392 692 0 Fax 49 2...

Page 2: ...on the product 3 2 Intended use 3 3 Safety 4 4 Connection and performance data 5 5 Mounting instructions 6 6 Mounting 6 7 Installation 7 8 Initial start up 8 9 Repair of failures 8 10 Repair 9 11 Mai...

Page 3: ...its correctly fitted cable The screw insertion the cable gland and the inserted cable must be in a resting position A fixed cable gland is observed The cable gland must not be considered only as a sin...

Page 4: ...ifications lead to invalidation of conformity Note the mounting position of the device or direction of flow of the medium to be heated when they are given Carry out periodic inspections in accordance...

Page 5: ...ube mm 52 Operating data Medium oil Operating temperature C 40 Max allowed temperature TS C 80 Max allowed pressure PS bar g 0 5 Connection head Dimensions connection head mm 108 x 108 x 90 red RAL 30...

Page 6: ...ation note When installing the device make sure that it is not damaged Heating elements Choose a seal witch is suitable for the medium Choose suitable screws Bolt the device flange with the installati...

Page 7: ...lation resistance amounts to no more than 50 Ohm V related to the calculation tension The supply voltage must correspond to the voltage indicated on the type plate For the selection of the cross secti...

Page 8: ...ements Set a temperature controller to the target temperature Guarantee that the temperature controller is duly attached Guarantee that the on site temperature limitation is duly attached By a tempera...

Page 9: ...k the thermostat and or limiter function Visual inspection for damage Visual inspection for deposits or incrustations on the heating elements Visual inspection for leaks Visual inspection of the elect...

Page 10: ...if necessary the cable entries must be equipped with blinds Place a drying agent in the connection area to absorb existing humidity Use only chemically indifferent drying agents e g silica gel Change...

Reviews: