3.2  Dimensions

All measurements in mm.

51

2

60

160

17

30,5

40,5

30

40,5

p/M5

M20

B

A

Key

A Position indication
B Reset button

3.3  Mounting set-up

For tensioned span lengths up to 10 m, intermediate wire supports are 
required every 2 to 5 m. To avoid resonance vibrations in the wire on 
machines with high vibrations, it is recommended to realise the individu-
al support length differently. Assembly: refer to image 2.

6 4

2 3

6

5

6

1

0,1 m

2-5 m

max. 10 m

4 6

3

2

A

B

9

8

2 3

0,1 m

2-5 m

max. 10 m

1

8

2

7

A

B

3

9

Image 2: mounting of the components

Key

1  Pull-wire with red PVC sheath Ø 5 mm (steel core: Ø 3 mm)
2 Eyebolt
3 Nut
4  Wire clamp
5 Tensioner
6  Wire thimble
7 Shackle
8  S900 wire tensioner
9  Tension spring ACC-700-RZ173
A  Position indication
B  Reset button

We recommend the use of the ACC-700-RZ173 tension spring to redu-
ce the effects of temperature variations. Due to the thermal expansion 
behaviour of the wire, the maximum authorised wire length is determi-
ned by the ambient temperature range (refer to image 3).

-10

-20

-30

1

0

2

3

4

5

6

7

8

9

10

0

10

20

30

40

50

60

70

l [m]

T[°C]

■  

without tension spring

■ 

with tension spring

Image 3: temperature-dependent maximum wire length with or without 
tension spring
The pull-wire must be fixed to the ring and then be pre-tensioned until 
the position indication is in the central position (refer to image 1).

As the thimbles are subject to deformation in case of wire pull, the wire 
should be pulled several times after fitting. After that, the wire must be 
re-tensioned (see image 4).

Image 4: deformation of the wire thimbles

In order to ensure an optimal operation safety and to save 
time during fitting, we recommend using the wire rope and 
the combined fixing and tensioning system from Schmersal. 
Alternatively, wire thimbles and wire clamps can be used in 
conjunction with a tensioner. In this case, the red PVC sheet 
must be removed in the clamp area prior to installing the wire 
rope. 

4.  Electrical connection

4.1  General information for electrical connection

The electrical connection may only be carried out by authorised 
personnel in a de-energised condition.

1. Cover screws must be loosened
2. Dust shield cap remove
3.  Cable glands M20 x 1.5 with an appropriate degree of protection 

must be used

4.  When wiring, please ensure that no cables are located within the 

range of the lever system and the pushbutton

5.  The inside of the switch must be imperatively cleaned  

(e.g. removal of cable residues), considering that foreign  
bodies can affect the switching behaviour

6.  The cover screws must be tightened uniformly  

(tightening torque 0.5 Nm)

The switch with plastic enclosure is double insulated. The use of an 
earth wire is not authorised.

Accessories cable gland:

Ordering code:  

103006013

Authorised cable diameter:  

6 - 12 mm

Tightening torque:  

4.5 Nm

4.2  Contact variants

ZQ 700-11

ZQ 700-02

14

13

22

21

12

11

22

21

Key

Positive break NC contact

Summary of Contents for ZQ 700-11

Page 1: ...sively used in accordance with the versions listed below or for the applications authorised by the manufac turer Detailed information regarding the range of applications can be found in the chapter Product description 1 5 General safety instructions The user must observe the safety instructions in this operating instruc tions manual the country specific installation standards as well as all prevai...

Page 2: ...of the emergency stop signal the reason why the switch has been actuated must be determined The switch can only be reset if the switch is correctly pre tensioned position indication in central position refer to image 1 The entire concept of the control system in which the safety component is integrated must be validated to the relevant standards 2 4 Technical data Standards IEC EN 60947 5 1 IEC EN...

Page 3: ...s in the central position refer to image 1 As the thimbles are subject to deformation in case of wire pull the wire should be pulled several times after fitting After that the wire must be re tensioned see image 4 Image 4 deformation of the wire thimbles In order to ensure an optimal operation safety and to save time during fitting we recommend using the wire rope and the combined fixing and tensi...

Page 4: ...Maintenance A regular visual inspection and functional test including the following steps is recommended 1 Check the functionality of the switch by actuating the wire 2 Check the cable entries and the wire connections 3 Remove particles of dust and soiling 4 Check the wire tension through the wire position indication and check the wire and the wire guides for damages and proper fitting Do not open...

Page 5: ...tly valid declaration of conformity can be downloaded from the internet at www schmersal net EC Declaration of conformity Translation of the original Declaration of Conformity ACE Schmersal Eletroeletrônica Industrial Ltda Rodovia Boituva Porto Feliz Km 12 Jardim Esplanada CEP 18550 000 Boituva SP Brasil Internet www schmersal com br We hereby certify that the hereafter described safety components...

Page 6: ...0 Telefax 49 0 2 02 64 74 1 00 E Mail info schmersal com Internet http www schmersal com Production site ACE Schmersal Eletroeletrônica Industrial Ltda Rodovia Boituva Porto Feliz Km 12 Jardim Esplanada CEP 18550 000 Boituva SP Brasil Telefone 55 0 15 32 63 9800 Telefax 55 0 15 32 63 9890 E Mail vendas schmersal com br Internet http www schmersal com br ...

Reviews: