
8. Commissioning
Original Operating Manual | Edition 1.0 (01-2020) | CrimpCenter 64 SP
189 | 268
EASY-Software (10 / 21)
"Please switch on the control voltage.”
CrimpCenter
12.
▹
Switch on the control voltage.
EASY-Software (11 / 21)
"Slide the stripping unit side 2 against the
deposit gripper.”
Deposit Gripper
13.
▹
Push the swivel against the deposit grip-
per until the stop.
EASY-Software (12 / 21)
"Position data is transferred to EASY.”
14.
▹
Confirm the message.
Preparing CrimpCenter for production again
Fig. 98: Air valve - Closed
EASY-Software (14 / 21)
"Switch-off the compressed air by closing
the blocking valve of the gripper side 1."
Behind swivel arm side 2
15.
▹
Close the blue valve.
EASY-Software (15 / 21)
"Pull the swivel side 2 out of the work area,
open the gripper on side 2 and remove the
setup pin.”
Gripper - Side 2
16.
▹
Move the swivel out of the work area.
17.
▹
Open the gripper.
18.
▹
Remove the setup pin.
» Put it back to the tool box.