B
7
SAGINAW CONTROL & ENGINEERING • A/C USER MANUAL
7. Mounting
8. Mounting Principle
1. M6 Bolts
2. M6 Toothed Washers
3. M6 Flat Washers
4. Enclosure
5. Mounting Gasket
6. Cooling Unit
Always disconnect the power supply before opening the unit.
Heat load to be dissipated from enclosure should not exceed specific cooling output of the unit at any condition. When
selecting a cooling unit, always allow for a safety margin of at least 15% extra cooling output in the worst conditions. Air
inlets and outlets must be completely free from obstruction.
Ensure that flows of air leaving and entering the cooling unit, internal and external, are not obstructed. Cooling unit enclosure
air suction hole must be installed at the highest possible point. When installing the unit on a door ensure it can take the
weight.
Before drilling the enclosure, ensure the fixing elements and couplings will not interfere with the equipment inside the
enclosure itself. Disconnect power before starting any work inside the enclosure. Following this 1:1 Scale Drilling Template,
drill the holes and make the required cuts on the enclosure. This template may have been affected by storage conditions,
please check this template by verifying values of the largest dimensions before drilling. Fit the sealing strip to the cooling
unit on the side connected to the enclosure and follow the installation diagram.