Document
9911004rev27
Title
Date
2017-02-16
Page
67(81)
SBS MicroSMART Battery Charger Technical Handbook
In order for the parallel control function to work it is important that all chargers in the
cluster have their secondary cable connected to the battery.
9.17.
Activate BMU controlled charge
If desired by the user, the charging can also be carried out according to charging parameters
set by a BMU (Battery monitoring unit). The BMU has to be mounted on the battery and
correctly configured. The charging parameters in the BMU are editable via the SBS
MicroSMART service tool. See
SBS MicroSMART Applications User manual
for more
information. Note that in order for the BMU to be able to control the charging process the
BMU and the charger has to be on the same network.
1.
In the service menu enter the menu
Charging param
. In the field
Source
choose
BMU
.
Press
OK
to confirm.
Press
ESC
to return to the main menu when ready.
2.
The Charger will now try to establish a connection with the BMU.
3.
If the attempt was successful, the following message will appear.