Savoy EASY FIT DECKING KIT Assembly Instructions Download Page 1

EASY FIT DECKING KIT ASSEMBLY INSTRUCTIONS

STEP 1

Thank you for choosing this Easy Fit Decking Kit from Savoy Timber.  

PLEASE RETAIN FOR FUTURE REFERENCE: READ CAREFULLY!

Important: Assembly of 

this Easy Fit Decking Kit 

requires two people. 

Assembly should take 

approx 1/2 a day. 

Project Essentials: 

Sold Separately

DRILL

TAPE MEASURE

GOGGLES

SCREWDRIVER

SAW

Cut Joints (B) to suit decking kit size (e.g. 2.4m x 2.4m)

Position the JOISTS equally from centre to centre and 

secure.

Position the NEWEL posts as shown on the 

inside of the base frame.

Secure using M10 Coach Bolts.

STEP 2

Go to step 3 if you are 

not fixing a handrail.

Pre-drill all holes

Pre-drill all holes

10x4

LEVEL

Timber

DIY Made Easy!

(10X4) X 2

(10X4) X 2

(10X4) X 2

(10X4) X 2

(10X4) X 2

(10X4) X 2

(10X4) X 2

(10X4) X 2

(10X4) X 2

(10X4) X 2

(10X4) X 2

(10X4) X 2

DUST MASK

M10 Coach 

Bolts

B

B

B

B

B

B

A

A

Reviews: