Routing and drilling device
58
Figure 71:
Cross rails flush with the supports on
the longitudinal rails
Clamp the mounting frame with the cross
rails flush on the supports.
Figure 72:
Mounting frame in left position
Loosen the clamping of the mounting frame
and move it to the left until it touches the
support.
Loosen the left-hand clamp of the cross
rails and adjust the cross rails so that the
entire length of the mounting frame is in
contact with the beam.
Clamp the cross rails again.
Figure 73:
Mounting frame in right position
Loosen the clamping of the mounting frame
and move it to the right until it touches the
support.
Loosen the right-hand clamp of the cross
rails and adjust the cross rails so that the
entire length of the mounting frame is in
contact with the support.
Move the mounting frame to the centre of
the cross rails and clamp it in place.
Result:
The routing and drilling device SlabMatrix Basic 1.0 is prepared for mounting on the
work plate.
Summary of Contents for SlabMatrix Basic 1.0
Page 41: ...Fräs und Bohrvorrichtung 41 16 Anhang Anwendungsbilder Anwendungsbilder ...
Page 42: ...Fräs und Bohrvorrichtung 42 ...
Page 43: ...Fräs und Bohrvorrichtung 43 Anwendungsbilder ...
Page 85: ...Routing and drilling device 85 29 Annex Application images ...
Page 86: ...Routing and drilling device 86 Application images ...
Page 87: ...Routing and drilling device 87 Application images ...