–10–
3-3.
HEAD
(See Figs. 3-3-1 to 3-3-3)
3-3-1. “COMPL, HOUSING REEL T
(2E000) ”,
“CORD, TERMINAL
(2J000) ”, “ASSY,
LEVER, TPH DOWN
(1F000) ”, and
“COMPL PWB, MC-1
(MC-1) ”
1)
Referring to section 3-1, remove the “MOTOR, FAN DC
1.8W
(7M000)
”.
2)
Remove the “SCR S-TPG BIN 2.6X4
(2F000)
” and
remove the “CORD, TERMINAL
(2J000)
”. (Refer to Fig.
3-3-1.)
3)
Remove the “COMPL, HOUSING REEL T
(2E000)
”.
(Refer to Fig. 3-3-1.)
4)
Remove the “SPECIAL WAHSER-3X0.5
(1G000)
”. (Re-
fer to Fig. 3-3-1.)
5)
Remove dowel 1 on the “ASSY, LEVER,TPH DOWN
(1F000)
” from hole 1 on the “ASSY, CHASSIS R
(7A000)
”.
(Refer to Fig. 3-3-2.)
NOTE: When carrying out steps 5) - 8), be careful not to
injure the surface of the head by pressing down too hard
on the “COMPL,HOLDER TPH
(1A000)
” shown in Fig. 3-
2-2. To prevent injury to the surface of the head, insert
printing paper (approx. 100mm wide x 148mm long) from
the ink ribbon slot.
6)
Insert dowel 1 side of portion A on the “ASSY, LEVER,
TPH DOWN
(1F000)
” into hole 2 on the “ASSY, CHASSIS
R
(7A000)
” as shown in Fig. B of Fig. 3-3-2.
7)
While press the “ASSY, LEVER, TPH DOWN
(1F000)
”
approximately 2mm to the “ASSY, CHASSIS R
(7A000)
” side, pull hole 3 on the “ASSY, LEVER, TPH
DOWN
(1F000)
” out from shaft 2 on the “ASSY, CHAS-
SIS L
(7C000)
”. (Refer to Fig. 3-3-2.)
8)
Be careful not to distort the “ASSY, CHASSIS R” and pull
portion A out from hole 2 and remove the “ASSY, LEVER,
TPH DOWN
(1F000)
”. (Refer to Fig. 3-3-2.)
9)
Disconnect the connector from the “COMPL PWB, MC-1
(MC-1)
”.
10) Remove the “SCR S-TPG BIN 2.6X4
(7K000)
” and
remove the “COMPL PWB, MC-1
(MC-1)
”. (Refer to Fig.
3-3-2.)
NOTE: It is unnecessary to remove the “COMPL PWB,
MC-1
(MC-1)
” to replace the “COMPL, HOLDER TPH
(1A000)
”.
ASSEMBLY NOTES:
1.
Insert portion B on the “COMPL, HOUSING REEL T
(2E000)
” into hole on the “ASSY, CHASSIS R
(7A000)
”
as shown in Fig. A of Fig. 3-3-1.
2.
Align hole 3 with shaft 2 on the “ASSY, CHASSIS L
(7C000)
”. Align dowel 1 with hole 1 on the “ASSY,
CHASSIS R
(7A000)
”. Align shaft 1 with slot 1 on the
“SLIDE, LEVER TPH
(5M000)
”. (Hole 3, dowel 1, and
shaft 1 are on the “ASSY, LEVER, TPH DOWN
(1F000)
”).
Be careful not to distort the “ASSY, CHASSIS R/L” and
install the “ASSY, LEVER, TPH DOWN
(1F000)
”.
SSCR S-TPG BIN
2.6X4
(2F000)
SPECIAL
WAHSER-3X0.5
(1G000)
ASSY, CHASSIS R
(7A000)
CORD,TERMINAL
(2J000)
COMPL,HOUSING
REEL T
(2E000)
Fig. A
Hole
Portion B
Fig. 3-3-1
ASSY,LEVER,TPH DOWN
(1F000)
ASSY,CHASSIS R
(7A000)
ASSY,CHASSIS L
(7C000)
SCR S-TPG BIN 2.6X4
(7K000)
COMPL PWB,MC-1
(MC-1)
Fig. B
Dowel 1
SLIDE,LEVER
TPH
(5M000)
COMPL,HOLDER
TPH
(1A000)
Dowel 2
Shaft 1
Portion A
Shaft 2
Ink ribbon
slot
Hole 2
Hole 2
Hole 3
Slot 1
Hole 1
Connector
While turning the
“ASSY, LEVER, TPH
DOWN
(1F000) ”, insert
its dowel 1 side slightly
into hole 2.
Fig. 3-3-2