
SY75C Excavator OMM
Park and Store the Machine
SANY
Operation and Maintenance Manual — 0220
4-29
TABLE OF
CON
T
ENT
S
INT
R
ODUCT
ION
SA
FETY
MA
C
H
INE
CONTROLS
MA
C
H
INE
OPERA
T
ION
MAINTENAN
C
E
SPECIFICA
T
IONS
OP
T
ION
AL
EQUIPMENT
PARK AND STORE THE MACHINE
Overnight Storage
1. Park the machine on a flat, level and stable surface away from people, traffic or other machines.
2. Lower the work equipment to the ground.
3. Run the engine at low idle speed (1,050 rpm) for about five minutes to allow for heat dissipation. Extend this
cool-down time in hot weather.
4. Turn the ignition key to the OFF position.
5. Remove the ignition key when the engine comes to a complete stop.
6. Place hydraulic lockout control lever (a) in the
LOCKED position.
7. Close and lock the windows.
8. Exit the cab and lock the cab door.
9. Fill the fuel tank.
10. Ensure that the following items are secured and locked.
•
Cab door (c)
•
A/C fresh air inlet door (d)
•
Left rear door (e)
NOTICE!
If performing a battery disconnect, wait for at
least one full minute before disconnecting the
battery cables so the machine ECM can
complete its shutdown procedure. Failure to
observe and follow this notice can cause
damage to the machine or cause the machine to
operate improperly.
Fig. 4-14
a
UNLOCKED
LOCKED
c
e
e
d
Fig. 4-15
d
Summary of Contents for SY75
Page 2: ......