SY215C LC/SY225C LC Excavator OMM
Maintenance
SANY
Operation and Maintenance Manual — 1219
5-15
TABLE
O
F
CONTENTS
INTRODUCTION
SAFETY
M
A
CHINE
CO
N
T
RO
L
S
MACHINE
OPE
R
A
T
IO
N
MAINTENANCE
S
PECI
F
ICA
T
IO
NS
OPT
IONAL
EQ
U
IPM
E
N
T
MAINTENANCE SCHEDULE
Secure the Machine for Maintenance
1. Park the machine on a flat, firm surface.
2. Obtain the maintenance log for this machine and complete it at the close of all maintenance procedures.
3. Read and understand all of the procedures to be performed.
4. Prepare the machine for checks and inspections. See “Maintenance Safety” on page 2-8.
5. Allow the machine to cool before performing maintenance.
When Required
•
Check air conditioner fresh-air and recirculation filters. (See page 5-27.)
•
Perform a stationary regeneration. (See page 5-85.)
•
Replace engine air filter. (See page 5-40.)
•
Replace hydraulic system breather filter. (See page 5-68.)
•
Check radiator, oil cooler, and air conditioner condenser. (See page 5-83.)
•
Check the track tension. (See page 5-96.)
•
Replace the bucket teeth. (See page 5-99.)
•
Check the windshield washer fluid. (See page 5-10.)
Daily or 10 Hours
•
Lubricate the work equipment. (See page 5-102.)
•
Check decals. (See page 5-34.)
•
Check sheet metal. (See page 5-84.)
•
Check idler wheels. (See page 5-73.)
•
Drain the primary fuel filter/water separator. (See page 5-81.)
•
Check the hydraulic pump mounting fasteners. (See page 5-82.)
NOTICE!
Failure to perform the following procedures when and as directed could result in machine
damage and improper machine operation.