
SY16C Excavator OMM
Maintenance
SANY
Operation and Maintenance Manual — 0420
5-53
TABL
E OF
CONT
E
N
TS
INTRODUCTION
SAFE
T
Y
MACHIN
E
CONTROLS
MACHINE
OP
ERA
T
IO
N
MA
INTENANCE
SPEC
IFI
CA
TIO
N
S
OP
T
IO
N
A
L
EQUI
PMENT
Arm Cylinder Base End Pin
1. Remove the grease fitting cap (1) from the arm
cylinder base end pin grease fitting (2).
2. Grease the arm cylinder base end pin grease fitting.
3. Wipe excess grease from around the grease fitting and
install the grease fitting cap.
Boom Cylinder Rod End Pin
1. Remove the grease fitting cap (1) from the boom cylin-
der rod end pin grease fitting (2).
2. Grease the boom cylinder rod end pin grease fitting.
3. Wipe excess grease from around the grease fitting and
install the grease fitting cap.
Boom Cylinder Base End Pin
1. Remove the grease fitting cap (1) from the boom cylin-
der base end pin grease fitting (2).
2. Grease the boom cylinder base end pin grease fitting.
3. Wipe excess grease from around the grease fitting and
install the grease fitting cap.
Fig. 5-42
0005134
1
2
Fig. 5-43
0005108
1
2
Fig. 5-44
0005109
1
2
Summary of Contents for SY16C
Page 2: ...Page Intentionally Blank ...
Page 207: ...Page Intentionally Blank ...