3. UNPACKING
5
3.1 UNPACKING
Note
※
:
Carefully inspect the outer packaging for evidence of the damage during transit. Don’t install a
damaged unit. Report any damage to the carrier and notify the local dealer immediately.
1) Remove the wrapping trap and the packing carton (Refer to Fig.1)
2) Remove the protective material (Refer to Fig.2);
3) Remove the subassemblies and the protective material from the frame (Refer to Fig.3);
4) Carefully unload the frame from the packing pallet and move it to its intended location for
installation.
5) To stabilize the frame in its operating location and turn the four Brake Pads
counter-clockwise tight against the floor. If the floor is uneven and the frame is tilted or
unstable, it is necessary to place a thin steel plate under a wheel. Don’t use the Brake Pads
to level the frame.
Fig.1
Fig.2
Fig.3
Summary of Contents for ARRAY 4
Page 1: ...USER MANUAL ARRAY 4 24kVA A UPS...
Page 37: ...34 614 06617 00...