background image

1

HZ1878-E

Precautions during installation

Assembling manual

Terrace roof TR/TF-series 600type Standard installation

Do not change or remodel it for another purpose except terrace roof.

This product is for general areas. It has a snow accumulation strength of

 

600N/m2(61.2kg/m2), which corresponds to 20cm of 

fresh snowfall (specific weight 0.3). Do not install in heavy snow area.

This product can be installed on the ground floor level. Please do not install on more than two -story.

Do not install it in the place where snow slides down from the building roof directly or strong wind blow up this terrace roof.

Standard installation of this product is installing on wooden body. When installing on the reinforced concrete structure or steel 

structure except wooden house, please install by using optional parts and screws.

Please check the house construction drawing and wall thickness before installation so that rear frame install firmly in the right 

position of the house structural reinforcing materials (reinforced post, crossbeam, etc.). Do not install on the mortar part by 

using plug anchors etc.

Position the posts not to affect underground objects (water supply, drain pipes, etc.).

When moving the posts, please follow the company specifications.

Install it so that the exhaust of hot-water supply, heating and/or the car do not hit directly to the products and do not retain 

around products. There is a possibility that the surface abnormality occurs as the coating film stripping.

Precautions during construction

Follow the instructions and be sure that all the specified screws and bolts for assembly are tightened securely. Please tighten 

the screws not to lean against the installation face.

Tighten the M8 bolts at approx. 13Nm (130kgfcm) tightening torque.

Do not use anything other than the specified parts or optional parts.

The foundation should comply with or exceed dimension specifications.

Please use the concrete and install the foundations.

Allow sufficient curing time for the concrete (4 to 7 days) and do not place heavy objects on it or subject it to vibrations during 

the curing period.

Be sure to keep the note below to prevent aluminum materials corrode.

 

(1) Do not use sea sand for the foundation since it contains 

salt  and  may  cause  corrosion.  Do  not  use  a  cement 

enhancer, water-reducing agent or cryoprotectant. They 

may cause the posts to corrode.

(3) Be sure to provide gravel for the foundation to allow drain-

age, insert water drainage holes (φ5) at the base of the 

posts and foundation. Failure to do so may lead to water 

accumulation  inside  the  posts  and  damage  them  if  the 

water freezes and expands inside.

(2) Immediately wipe off any mortar or stains from the surface 

of aluminum parts since they may cause corrosion.

Thank you very much for choosing our company's products.

Please be sure to thoroughly read these instructions for assembly in order to properly and smoothly assemble or attach this pr oduct.

The precautions provided herein contain important information to ensure product performance, function, strength and safety. 

Please be sure to follow them during construction.

Construction shall be implemented by professionals. Problems may occur if the product is installed by someone without the 

proper knowledge.

Please be sure to return this manual to the owner after construction.

Notice

sea

sand

cement

enhancer

water-

reducing

cryopro

tectant

water

drainage

hole

Summary of Contents for SankyoAlumi TF Series

Page 1: ...ssembly are tightened securely Please tighten the screws not to lean against the installation face Tighten the M8 bolts at approx 13Nm 130kgfcm tightening torque Do not use anything other than the spe...

Page 2: ...ost and front frame installation 3 Temporal fixing of post and front frame 4 Side frame and rafter installation 5 Furring strips installation 1 1 2 2 2 3 7 8 11 12 13 14 15 16 16 17 Installation proce...

Page 3: ...A4923 GA0073 Shape name Parts ID Materials Parts Shape name Parts ID Materials Shape name Parts ID Materials Shape name Parts ID Furring strip set part E rafter pitch 909mm type M rafter pitch 1000mm...

Page 4: ...44 32 30 34 32 38 36 40 38 15 14 18 16 22 20 24 22 40 38 44 42 32 30 34 32 34 32 36 34 38 36 40 38 42 40 61 58 65 62 side frame A upset bolt M5x12 right left each 1pc right left each 1pc right left ea...

Page 5: ...2 T TN 80 1 T TN 90 5 T TN 90 4 T TN 90 3 T TN 10 5 T TN 10 4 T TN 10 3 T TN 11 3 T TN 11 2 T TN 12 3 T TN 12 2 TFTN 13 3 TFTN 13 2 TFTN 14 3 TFTN 14 2 TFTN 15 3 TFTN 15 2 TFTN 18 3 TFTN 18 2 TFTN 2A...

Page 6: ...g screw 4 13 8 Parts Parts box for connecting Rain gutter parts set part R R type F F type part D R type DE F type T BN ABW T BN CW T BN W 9 8 9 8 5 4 2 2 2 R front frame sleeve GB8655 F front frame s...

Page 7: ...4 T P 90 6 T P 10 4 T P 10 6 T P 11 2 T P 11 3 T P 12 2 T P 12 3 TFP 13 2 TFP 13 3 TFP 14 2 TFP 14 3 TFP 15 2 TFP 15 3 TFP E18 2 TFP E18 3 TFP E2A 2 TFP E2A 3 4 6 4 6 2 3 2 3 2 3 2 3 2 3 2 3 2 3 10 No...

Page 8: ...of connecting installation L1 W1 100 L2 W2 100 h dimension formula in case of front frame S h H D tan7 252 3 tan7 0 123 In case of long post add 1000mm to h dimension h dimension differs depending on...

Page 9: ...lue 20 Front frame D h dimension additional value 70 Front frame B h dimension additional value 0 1 2 3 2 3 B A B B D C B 909 1000 454 5 500 70 2070 80 2370 90 2670 10 2970 11 3270 12 3570 1818 2000 2...

Page 10: ...he post 60mm toward the side frame from the standard post position L F type 909 type 1000 type h dimension formula in case of front frame S h H D tan7 37 1 tan7 0 123 In case of long post add 1000mm t...

Page 11: ...Front frame B h dimension additional value 0 1 2 3 2 5 3 B A B C B D E C B 909 1000 454 5 500 70 2070 80 2370 90 2670 10 2970 11 3270 12 3570 13 3870 14 4170 15 4470 18 5370 2A 5970 1818 2000 2727 300...

Page 12: ...g holes do sealing work into the holes rear frame furring strip side frame rear frame roof retainer end front frame cap post fixing part anchor rod rafter roof panel post fixing part middle front fram...

Page 13: ...27 12 3436 15 4345 18 5254 200 300 400 500 1800 2800 500 600 650 600 3800 4800 3270 3570 3870 4170 4470 5370 5970 Nominal width L mm Nominal width L mm D mm Depth Width 909 type 1000 type Nominal dept...

Page 14: ...s c r e w d e p t h 3 0 t o 8 0 t y p e 9 0 0 1 0 0 0 m m d e p t h 9 0 t o 2 A t y p e 4 5 0 5 0 0 m m e n d m a x 1 0 0 W Make 7 holes on site 4 5 5 rear frame Make 6 4 and approx 46mm deep holes a...

Page 15: ...ation For depth 18 2A type Standard position Standard position Standard position 100 30 4 9 50 90 100 50 2 6 67 5 100 7 7 7 7 small truss screw 5 10 10 Post set small truss screw 5 10 10 Post set hexa...

Page 16: ...t is front frame side rafter front frame side frame rear frame small truss screw 5 10 10 Side frame set Rafter set 3 Temporal fixing of post and front frame 4 Side frame and rafter installation In cas...

Page 17: ...frame fin furring strip Be careful not to scratch the roof panels In case of mat panel attach the unevenness side down Otherwise the panel is easy to get dirty In case of heat absorb self cleaning po...

Page 18: ...ar frame side in order and fix the panels In case the pressing is not enough it may cause leakage of rain If the screw head leans when installing the roof retainers it will cause water leakage the rai...

Page 19: ...ront frame rear frame cap rear frame front frame front frame cap rear frame cap roof retainer end 19 Single unit installation procedure 8 Front frame S Front frame M Front frame L Do sealing work to f...

Page 20: ...f size Be sure to seal around screws in order to prevent danger when cleaning as well as water proof elbow 85 drain gutter gasket gutter cap front frame elbow 85 round gutter saddle round gutter drain...

Page 21: ...idth set front frame connecting sleeve Dot line indicates no need to screw Front frame S Front frame L Front frame L Front frame M Front frame S Front frame M 20 35 201 8 50 75 50 40 120 10 4 6 70 10...

Page 22: ...cting sleeve 2 Post and front frame assembling For depth 18 2A type In case of front frame L front frame connecting sleeve small truss screw 5 10 10 post fixing part B middle post front frame small tr...

Page 23: ...me cover front frame cover drilling screw 4 13 8 front frame front frame cover front frame front frame connecting sleeve W front frame connecting sleeve front frame connecting sleeve front frame cover...

Page 24: ...part post Screw at 10mm from end of post connecting parts Screw at 10mm from connecting part Screw at 10mm from connecting part post connecting parts 2 truss screw 5x20x10 Make holes on post connecti...

Page 25: ...connecting part A Screw at 10mm from connecting part A Screw at 10mm from connecting part front frame connecting sleeve W Ttruss screw 5x20x10 Make hole on front frame 6mm sleeve 4 5mm on site 2 truss...

Page 26: ...depth 60 200 90 300 12 400 15 500 18 Nominal width 30 Front frame S 0 Front frame M 20 Front frame L 70 40 50 60 70 80 90 10 11 12 h dimension differ according to the front frame size add the addition...

Page 27: ...t frame S h mm Nominal depth 60 200 90 300 12 400 15 500 18 Nominal width 30 Front frame S 0 See material instruction guide table on page 11 about the details of material use Front frame M 20 Front fr...

Page 28: ...3800 4800 1718 2627 3536 4445 1900 2900 3900 4900 1818 2727 3636 4545 5454 2000 3000 4000 5000 909 type 1000 type 909 1000 500 454 5 454 5 L1 100 L P P P 13 5 W 10 100 L1 P P P 10 L1 P 13 5 W W 50 10...

Reviews: