Ver.
Smart MBS RRH-P4 Installation Manual/Ver.3.0
© SAMSUNG Electronics Co., Ltd.
B-5
2600-00CTEIGAA
4.0
B.2 Antenna Feeder Cable Ground
Ground the antenna feeder line using the grounding kit located under the Tower Ground
Bar (TGB) installed in the lower section of the tower or in the antenna feeder line duct.
The way to connect the ground kit of feeder is as follows:
Figure B.1 Feeder Cable Grounding (1)
M6 Hex. Nut
Ground Kit
Insulation Tape
Rubber Tape
M6 × 25L Hex. Bolt
M6 Spring Washer
M6 Plane Washer
M6 Plane Washer
M6 Spring Washer
2.
17 i
n.
(55 m
m
)
1) Remove about 55 mm of the sheath of cable when the 2.17 in. (55 mm). feeder cable is used.
2) Open it by returning hook of the clamp fixing for Ground kit in the left direction.
1
2