SAMSUNG Proprietary-Contents may change without notice
Exploded view and its Part list
3-14
This Document can not be used without Samsung's authorization
Put the main key pad on the front
case
Place the shield can over the main
key pad
Confirm the bending state of Main
FPCB
Push the main FPCB into the Main
connector
Insertion guide
Insertion guide II ;
MAIN KEY PAD's GUIDE HOLE
shield can's
guide line
Confirm the
alignment
Push the whole parts
of FPCB equaly
Push the middle of actuator
first and the both sides later
1
2
2
45
44
42
43
41
40