
English –
15
ENG
Installation
⑤
Tighten locking screw.
⑥
Connect Video, communication, power cable
properly. (see next section)
SCC-C6325
①
To pass cables to upside of ceiling, please,
make about
ũ
60mm hole on the ceiling panel.
②
Screw surface mount bracket to ceiling with
4 screws.
③
Wire cables to terminal block and connect the
terminal blocks to main unit.
❖