
English –
11
ENG
Introduction
SCC-C6325
❖
Dome Cover
Do not remove the protection vinyl from dome cover
before fi nishing all installation process to protect
dome cover from scratches or dust.
Surface Mount Bracket
This is used to install the camera directly on the
ceiling. After separating this cover, mount this
bracket on to ceiling. Main body of the camera is
going to be assembled again in the last stage.
Do not use this bracket with wall mount bracket or
ceiling mount bracket.
•
•
Lockup Screw
Fixes main unit brackets like surface, wall, and
ceiling.
Cabling Terminal Block
During installation, Power, Video, Communication,
Alarm Input cables are connected on to this cabling
terminal block.
DIP Switch
Adjusts camera ID and protocols.
•
•
•
Main Unit / Surface Mount Bracket
Back of Main Unit
Surface Mount Bracket
Mounting Hole
Main Body
Dome Cover
Lockup Screw
Cabling Terminal
Block
DIP Switch
Summary of Contents for SCC-C6323P
Page 41: ...English 41 ENG Specifications DIMENSION Unit mm SCC C6323 SCC C6325 PIPE THREAD ...
Page 127: ...Deutsch 41 GER Technische Daten ABMESSUNGEN Maßeinheit mm SCC C6323 SCC C6325 ROHRGEWINDE ...
Page 170: ...Español 41 SPA Especificaciones DIMENSIONES Unidad mm SCC C6323 SCC C6325 ROSCA DE TUBO ...
Page 213: ...Italiano 41 ITA Specifiche MISURE Unità mm SCC C6323 SCC C6325 FILETTATURA 3 4 ...