English
27
Ins
tallation
Step-by-step installation
STEP 1
Select a site
Site requirements:
• Solid, level surface without carpeting or flooring that may obstruct ventilation
• Away from direct sunlight
• Adequate room for opening and closing the door
• Away from a heat source
• Room for maintenance and servicing
• Temperature range: between 10 °C and 43 °C
Clearance
See the following figures and tables for space requirements for installation.
C
B
A
Depth “A”
688
Width “B”
595
Overall Height “C”
1853
(unit : mm)
Untitled-3 27
2022-09-15 6:09:05