5. Measure the first row by spirit level, make sure it is installed horizontally, then fix the nuts
tightly between the cabinets and the connect plates.
6. Place the middle cabinet in the second row, adjust it and fix it but not tight. Make sure it is
installed horizontally and vertically, then fix it tightly as shown as below
7. Finish the second row by the same way as shown as below
8. Finish the rest installation of all the cabinets by the same way as shown as below.
Summary of Contents for P10
Page 3: ...3 10 1 Cleaning 104 10 2 Calibration 105 10 3 Replacement steps 106 11 Appendix 119 ...
Page 12: ...12 3 2 Product Appearance ...
Page 13: ...13 ...
Page 14: ...14 3 3 Product design Decomposition chart ...
Page 15: ...15 Assembly drawing ...
Page 16: ...16 3 4 Product main components Module Power Supply Receiving Card Monitoring Card ...
Page 17: ...17 Fan Hub board Power data cables 16pcs DC power cables 8PCS and Flat cables 16 pcs ...
Page 35: ...35 Installation of cabinets Fixing of connect plate ...
Page 42: ...42 8 2 Port of Cabinet and serial number paint ...
Page 59: ...59 ...
Page 68: ...68 ...