Details of installation
1. First measure the under surface of the structure as a horizontal plane and the side of the
structure as a vertical plane by spirit level as shown as below
2. First cabinet is placed in the middle of the bottom row with the stud rods in the middle of
the corresponding slot as shown as below, do not fix the nuts tightly.
3. Place the cabinets beside one another from the middle of the row to the sides as shown
as below, do not fix the nuts tightly
4. Finish the first row by same way as shown as below.
Summary of Contents for P10
Page 3: ...3 10 1 Cleaning 104 10 2 Calibration 105 10 3 Replacement steps 106 11 Appendix 119 ...
Page 12: ...12 3 2 Product Appearance ...
Page 13: ...13 ...
Page 14: ...14 3 3 Product design Decomposition chart ...
Page 15: ...15 Assembly drawing ...
Page 16: ...16 3 4 Product main components Module Power Supply Receiving Card Monitoring Card ...
Page 17: ...17 Fan Hub board Power data cables 16pcs DC power cables 8PCS and Flat cables 16 pcs ...
Page 35: ...35 Installation of cabinets Fixing of connect plate ...
Page 42: ...42 8 2 Port of Cabinet and serial number paint ...
Page 59: ...59 ...
Page 68: ...68 ...