Level 2 Repair
Distribution, transmission, or infringement of any content or data from this document without Samsung’s written authorization is strictly prohibited.
Confidential and proprietary-the contents in this service guide subject to change without prior notice.
7-3
1. Connect all connector to the board
1. Assemble the rear to the Front Ass`y
1. Screw 15 points
1. Screw Torque : 1.3 Kgf·cm
1. check the all part of Front Ass`y
1. Check the rear and SPK