Disassembly and Reassembly
Samsung Electronics
41
No.
Work Procedure
Remark
1
Unfasten the two screws on the inspection window of the
Panel Front.
Open the rain cover.
The rain cover is connected via a ring to the device in
order to prevent loss.
- Operating the device with the rain cover opened may
cause rainwater to enter the C-BOX and damage the PBA.
Use the inspection window on the Main PBA to check the
following.
- Error code
- Operation status (Key Switch K1- K4)
- Trial operation
- Pump down operation
- S-NET connection
(specific operation information and the cycle-related
status value can be viewed)
Inspection window
Screw
Rain cover
3-2 Disassembly and Reassembly
3-2-1 Checking the Device Condition
Summary of Contents for AM080FXWANR
Page 168: ...Samsung Electronics 165 5 PBA Diagram and Parts List 5 1 ASS Y PBA MAIN Push buttons Type...
Page 170: ...PBA Diagram and Parts List Samsung Electronics 167 5 1 ASS Y PBA MAIN cont DIP S W Type...
Page 172: ...PBA Diagram and Parts List Samsung Electronics 169 5 2 ASS Y PBA MAIN HUB AC...
Page 174: ...PBA Diagram and Parts List Samsung Electronics 171 5 2 ASS Y PBA MAIN HUB cont DC...