Leak test
LEAK TEST WITH NITROGEN (before opening valves)
In order to detect basic refrigerant leaks, before recreating the vacuum and recirculating the R-410A, it’s responsible of
installer to pressurize the whole system with nitrogen (using a pressure regulator) at a pressure above 595 PSI (4.1MPa).
LEAK TEST WITH R-410A (after opening valves)
Before opening valves, discharge all the nitrogen in the system and create vacuum. After opening valves check leaks using
a leak detector for refrigerant R-410A.
CAUTION
Discharge all the nitrogen to create a vacuum and charge the system
Leak
check
Insulation
Once you have checked that there are no leaks in the system, you can insulate the piping and hose.
1. To avoid condensation problems, place
T13.0mm (0.51”) or thicker
Acrylonitrile Butadien Rubber
separately around each refrigerant pipe.
•
You can contact the gas side and liquid side pipes but the pipes should not
be pressed together tightly.
•
When contacting the gas side and liquid side pipe, use 1 grade thicker
insulator.
NOTE
Always make the seam of pipes face upwards.
2. Wind insulating tape around the pipes and drain hose avoiding to compress the
insulation too much.
3. Finish wrapping insulating tape around the rest of the pipes leading to the
outdoor unit.
4. The pipes and electrical cables connecting the indoor unit with the outdoor unit
must be fixed to the wall with suitable ducts/straps.
Leak check
NBR [T13.0mm (0.51”) or thicker]
Insulation
Indoor unit
Be sure to
overlap the
insulation
Gas pipe
Insulation
Liquid pipe
Insulation pipe
CAUTION
All refrigerant connection must be accessible, in order to permit
either unit maintenance or removing it completely.
CAUTION
Must fit tightly against
body without a gap.
Performing leak test & insulation
AM072TNZDCH_IM_DVM V-AHU_AA_EN_.indd 15
2020-02-14 오전 10:33:32
Summary of Contents for AM0 SERIES
Page 45: ...45 English Appendix Memo AM072TNZDCH_IM_DVM V AHU_AA_EN_ indd 45 2020 02 14 오전 10 33 41 ...
Page 46: ...AM072TNZDCH_IM_DVM V AHU_AA_EN_ indd 46 2020 02 14 오전 10 33 41 ...
Page 91: ...45 Français Annexe Note AM072TNZDCH_IM_DVM V AHU_AA_FR_ indd 45 2020 02 14 오전 10 35 49 ...
Page 92: ...AM072TNZDCH_IM_DVM V AHU_AA_FR_ indd 46 2020 02 14 오전 10 35 49 ...