3
.
Installing the Product
Confidential
106
English 8/2019. Rev 0.0
3.10.10
DC Link Cable Connection
1.
Connect the ground cables.
Figure 3-128: Grounding Points (2 EA)
NOTICE
Connect the rack ground wire with an M12 screw
.
Rack ground screws and cables are not
factory-provided and must be provided by the installer or customer.
The fastening torque should be 30Nm (300kgf∙cm)
.
45 mm Pitch
Between Holes
Summary of Contents for 136S
Page 1: ...Confidential English 8 2019 Rev 0 0 LIB System for UPS Installation Manual 136S ...
Page 4: ...Confidential English 8 2019 Rev 0 0 ...
Page 10: ...Important Safety Instructions Confidential vi English 8 2019 Rev 0 0 ...
Page 18: ...Confidential Table of Contents viii English 8 2019 Rev 0 0 ...
Page 153: ...Confidential Memo ...
Page 154: ...Confidential Memo ...
Page 155: ...Confidential Memo ...
Page 156: ...www SamsungSDI com ...