![Samson TROVIS 6495-2 Mounting And Operating Instructions Download Page 34](http://html1.mh-extra.com/html/samson/trovis-6495-2/trovis-6495-2_mounting-and-operating-instructions_4075578034.webp)
5-2
EB 6495-2 EN
Installation
1
2
1
Immersion depth with terminals (without wiring): 151 (5.95")
1 Mounting clamp
2
Seal
3 Panel cut-out on install-
ing several controllers
3
>15
92
+0,8
(3.62"
+0,3
)
92
+0,8
(3.62"
+0,3
)
>30
Fig. 5-2:
Installation · Dimensions in mm (inch)
5.4 Installing the interface
board
For operation of the controller with one of
the two interface boards:
The interface board is fitted at the back of
the controller.
1. Switch off the supply voltage.
2.
Press the two catches on the blank cover
inwards at the same time. Pull out the
blank cover.
3.
Push the interface board with cover into
the opening, making sure that the
interface board is inserted in the guide
Summary of Contents for TROVIS 6495-2
Page 6: ...EB 6495 2 EN...
Page 46: ...6 6 EB 6495 2 EN...
Page 90: ...8 26 EB 6495 2 EN...
Page 94: ...9 4 EB 6495 2 EN...
Page 96: ...10 2 EB 6495 2 EN...
Page 98: ...11 2 EB 6495 2 EN...
Page 100: ...12 2 EB 6495 2 EN...
Page 102: ...13 2 EB 6495 2 EN...
Page 104: ...14 2 EB 6495 2...
Page 107: ...EB 6495 2 15 3 Certificates TR CU certificate...
Page 108: ...15 4 EB 6495 2 Certificates...
Page 109: ...EB 6495 2 15 5 Certificates...
Page 110: ...15 6 EB 6495 2...
Page 185: ......