Table 5-1:
Inlet and outlet lengths
Control line (e.g. control line kit, see information
under ‘Control line’ in section 5.1)
DN
min.
a x DN
min.
b x DN
a
Inlet length
b
Outlet length
State of process
medium
Valve conditions
Inlet length a
Outlet length b
Gas
Ma ≤ 0.3
2
4
Vapors
1)
Ma ≤ 0.3
2
4
Liquid
Free of cavitation/w < 3
m
/
s
2
4
Cavitation producing noise/w ≤ 3
m
/
s
2
4
1)
No saturated steam
Connection above the middle of the flange:
18
4
H
k
Additional condensate head
4 Pressure regulator
18 Compensation chamber
Fig. 5-3:
Installation example with steam
Summary of Contents for 41-73 Series
Page 14: ...1 10 EB 2517 EN...
Page 48: ...8 4 EB 2517 EN...
Page 60: ...11 2 EB 2517 EN...
Page 62: ...12 2 EB 2517 EN...
Page 64: ...13 2 EB 2517 EN...
Page 68: ...14 4 EB 2517 EN Certificates 2...
Page 69: ...EB 2517 EN 14 5 Certificates 3...
Page 70: ...14 6 EB 2517 EN...
Page 75: ......
Page 76: ......
Page 77: ......