![Samson 3349 Mounting And Operating Instructions Download Page 51](http://html1.mh-extra.com/html/samson/3349/3349_mounting-and-operating-instructions_3821587051.webp)
EB 8048-2 EN
8-3
Malfunctions
8.2
Emergency action
Plant operators are responsible for emergen-
cy action to be taken in the plant.
In the event of a valve malfunction:
1. Close the shut-off valves upstream and
downstream of the control valve to stop
the process medium from flowing
through the valve.
2. Perform troubleshooting (see sec-
3. Rectify those malfunctions that can be
remedied based on the instructions pro-
vided here. Contact our after-sales ser-
vice in all other cases.
Putting the valve back into operation after
a malfunction
See the 'Start-up' section.
Summary of Contents for 3349
Page 6: ...6 EB 8048 2 EN...
Page 15: ...EB 8048 2 EN 1 9 Safety instructions and measures...
Page 16: ...1 10 EB 8048 2 EN...
Page 34: ...4 6 EB 8048 2 EN...
Page 44: ...5 10 EB 8048 2 EN Installation...
Page 52: ...8 4 EB 8048 2 EN...
Page 66: ...9 14 EB 8048 2 EN...
Page 72: ...12 2 EB 8048 2 EN...
Page 74: ...13 2 EB 8048 2 EN...
Page 92: ...14 18 EB 8048 2 EN...
Page 100: ...15 8 EB 8048 2 EN...
Page 101: ......
Page 102: ......
Page 103: ......