5-6
EB 8048-2 EN
Installation
2
1
24
3
21
5.1
36
40
34
Fig. 5-3:
Assembling Type 3349 Valve and
Type 3379 Actuator
5.3.2 Installing the valve into
the pipeline
Risk of valve damage due to work being
carried out by personnel not qualified for
such tasks.
The plant operator or specialist company
performing the welding is responsible for the
selection of the welding procedure and the
actual welding operations on the valve. This
also applies to any required heat treatment
to be performed on the valve.
Î
Only allow qualified welding personnel
to carry out welding operations.
Premature wear and leakage due to insuffi
-
cient support or suspension.
Î
Support or suspend the valve sufficiently
at suitable points.
To meet 3-A conformity requirements, a gas
-
ket recommended by 3-A Sanitary Stan
-
dards Inc. (see website
u
http://www.3-a.org) must be used for a
Type 3349 Valve with threaded ends accord
-
ing to DIN 11851/DIN 11887.
1. Close the shut-off valves in the pipeline
at the inlet and outlet of the plant section
while the valve is being installed.
2. Prepare the relevant section of the pipe-
line for installing the valve.
NOTICE
!
NOTICE
!
Note
Summary of Contents for 3349
Page 6: ...6 EB 8048 2 EN...
Page 15: ...EB 8048 2 EN 1 9 Safety instructions and measures...
Page 16: ...1 10 EB 8048 2 EN...
Page 34: ...4 6 EB 8048 2 EN...
Page 44: ...5 10 EB 8048 2 EN Installation...
Page 52: ...8 4 EB 8048 2 EN...
Page 66: ...9 14 EB 8048 2 EN...
Page 72: ...12 2 EB 8048 2 EN...
Page 74: ...13 2 EB 8048 2 EN...
Page 92: ...14 18 EB 8048 2 EN...
Page 100: ...15 8 EB 8048 2 EN...
Page 101: ......
Page 102: ......
Page 103: ......