SAMSGAZEBOS 10-OCT-A-CUPOLA Assembly Instructions Manual Download Page 1

 

 

 

 

 

  S

AMS

G

AZEBOS

TM

 

 

10’ Octagon Gazebo #A single-ered roof for an uneven pao  

 

Assembly Instrucons 

 

 

 

 

 

 

 

 

 

 

 

10-OCT-A-CUPOLA 

10-OCT-A 

 

 

 

 

S

AMS

G

AZEBOS.COM, INC.

 

 

 

 

132 E. 163rd Street, Gardena, CA 90248

 

 

 

 

Customer Service: (800) 376-7267    [email protected] 

 

 

 

Monday ~ Friday: 8:00~ 6:00, Saturday: 10:00 ~ 4:00 (Pacific Standard Time)

 

Summary of Contents for 10-OCT-A-CUPOLA

Page 1: ...ed roof for an uneven pa o Assembly Instruc ons 10 OCT A CUPOLA 10 OCT A SAMSGAZEBOS COM INC 132 E 163rd Street Gardena CA 90248 Customer Service 800 376 7267 info samsgazebos com Monday Friday 8 00 6...

Page 2: ...y parts are missing or you have any ques ons please contact Customer Service at 800 376 7267 2 Lay out the parts in separate staging area We recommend you set aside the same parts together while you g...

Page 3: ...e ered roof List of Parts 8 Headers 8 Posts 1 standard and 7 longer 8 RaFers 8 Post Bases One is aGached to the standard post 8 Upper Roof Panels 8 Lower Roof Panels Standard Post Longer Post This is...

Page 4: ...4 16 Corbels 5 Rails 5 Top Rails 8 Temporary Post Holders 2 Wood Pieces 1 small and 1 large 1 small 4x4 for leveling 8 3 8 Hanger Bolts with Washers Nuts Rail Top Rail 2 Temporary Rail Holders...

Page 5: ...the header connectors Large for every where else 8 3 8 Lag Bolts Washers 8 3 8 Wedge Anchors Screws 16 Small for the boGom of the lower roof panels Large for everywhere else 8 Header Connectors 1 Cupo...

Page 6: ...bo has three entrances Rotate them to your liking 3 Fasten each of the headers together with large nails ONLY half way 5 Repeat steps 3 and 4 for the remaining seven corners 6 Measure the inside heade...

Page 7: ...all 4 x 4 around the center of the headers and trace it with a pencil This should NOT be removed during the leveling 11 Check the level and mark the leveled horizontal line for each corner 12 Con nue...

Page 8: ...g a square extend the line you marked as 1 around the perimeter of the wood you have been marking in steps 12 13 1 1 1 16 Label the headers the corners of the pa o 1 to avoid mistakes or confusion Put...

Page 9: ...f the post using a square This is the line you will need to cut 22 If you are using a circular saw cut the post from side to side then rotate and proceed to cut through the post in this fashion 23 AGa...

Page 10: ...ement to mark for the post base 27 A good way to keep tack of marks is to rotate the leveling wood piece as you level 28 Now the seven posts are adjusted the post bases are fastened and ready to insta...

Page 11: ...with the inside corners tracing of the headers drawn in steps 7 and 8 34 Sweep the dust away again 33 Drill 1 1 2 deep where you previously drilled in step 29 The line should be directly over the dri...

Page 12: ...approximately 1 1 2 deep where you marked 38 Let the bolt of the post base slip into the hole 39 Align the diagonal pencil line to the center of the post base Inside Outside Outside 40 Temporarily aG...

Page 13: ...wedge anchor with a socket wrench Temporary Post Holder Rail 44 Insert a wedge anchor into the newly drilled hole and hammer it in 46 Go to the next post and repeat steps 38 45 Put a tem porary post...

Page 14: ...with a large screw as shown above 52 Fasten the rail again but this me to the lower end Repeat this process on the other side of the rail 53 Fasten a top rail to the posts with large screws Header Pos...

Page 15: ...s with a large screw 57 Fasten down the headers with the washers and nuts 58 Fasten each header to a post with large screws 59 Fasten a header connector to each corner with small nails Repeat this pro...

Page 16: ...the raFer top posi ons up or down as you install raFers Ra ers 64 As you do this fasten the raFer tops with large nails Coun tersink the large nails for a perfect t 65 Fasten the raFer end from both s...

Page 17: ...n the roof ends with small screws 70 Gently hammer the roof ends if there are gaps in between the roof panels 72 Once you are complete with the lower panels install the upper roof panels with the smoo...

Page 18: ...ils from the headers from step 55 75 Fasten an op onal cupola with large screws aFer installing a roo ng material of your choice The heavier look ing sides should be at the boGom 73 Fasten the upper r...

Reviews: