
Clevertronics Clever-test
The Clevertronics Clever-test Lifelight (LLIFEM-PRO-SA-CT) can be programmed to perform 90 minute
discharge tests at 6-month intervals. A manual test is initiated by pressing the test switch 3 times within a
5s period (immediate discharge test). A 24 hour delayed test (to allow batteries to fully charge before a
test) can be initiated by pressing the test switch and hold for 10 seconds (i.e., until LED Test Switch
indicator flashes rapidly). Refer Clever-test Operation Guide for more information. Once the test has been
completed, maintenance personnel then view the Status Indicator of each fitting to determine a pass or
failure:
SOLID GREEN
(not flashing)
NORMAL
– The luminaire is in a normal state charging and awaiting
next discharge test.
SLOW YELLOW FLASH
(2s Yellow, 2s Off)
TESTING
– The luminaire is currently performing a test.
VERY SLOW YELLOW & Green
(4s Yellow, 1s Green)
RECENTLY PASSED
– The luminaire has previously tested and
passed. This indication remains for 5 days after the completion of the
test and then changes to SOLID Green to indicate a normal state.
FAST YELLOW & Green FLASH
(0.5s Yellow, 0.5s Green)
FAILED LAST TEST
– The luminaire has previously tested and failed
to remain illuminated for the required duration. This indication will
remain until the required maintenance work has been completed and
the luminaire passes a subsequent discharge test.
Zoneworks and DATA Monitored Options
Lifelights with part numbers
LLIFEM-PRO-SA-ZW, LLIFEM-PRO-SA-DATA
are fitted with Zoneworks
communications modules (nodes).These fittings are monitored using either Powerline Carrier Technology
that utilising the power cable to provide data communication or a dedicated data cable to/from data routers
installed on a dedicated data trunk connected to a central Server (can also be connected via
Ethernet/Internet/Fibre). Zoneworks software on the server is used to monitor, coordinate testing and
collate test data from each Lifelight. Zoneworks Lifelights can be commissioned by a single push of the test
switch, or scanning of the supplied barcode. The LED Test Switch indicator provides a multifunction
indication of the status of the Lifelight during testing and normal operation:
State
LED Operation
Commissioned
LED on Solid (Green)
Un-commissioned
LED flashes at 0.5Hz (0.5s Green, 0.5s Yellow)
Emergency Light Test In Progress
LED flashes at 3s On (Yellow) & 0.5s Off
In the case of the DATA version a 2-
way “figure 8” cable and terminal block facilitates the connection to the
DATA network via a multi-drop bus (daisy chain connection). For further information of installation of a
Zoneworks LW system, please refer to the Zoneworks Users Guide and Commissioning Guide (incl. DATA
version)
DALI EM Option
Lifelights with part numbers L
LIFEM-PRO-SA-DALI
are fitted with DALI modules (nodes) that facilitate
connection and integration to 3
rd
Party Lighting Control Systems. Before installing the LLIFE-PRO-DALI
please confirm that the Lighting Control System has the capability to monitor DALI Emergency Luminaires.
The LLIFE-PRO-DALI will be addressed and configured into the control system by the Lighting Control
System Commissioning Technicians and not Clevertronics.
State
LED Operation
Commissioned/ Un-commissioned
LED on Solid (Green)
Emergency Light Test in progress
LED flashes at 1s On (Yellow) & 1s Off
“IDENTIFY COMMAND”
Fitting goes into emergency mode for 10 seconds
A 2-
way “figure 8” cable and terminal block facilitates the connection to the DALI network OR a 5/6way
“structured wiring system” lead and plug facilitating the power and DALI connection. DALI connections
are marked as Da Da.
MAXWELL SUB-ZERO REMOTE MAINTAINED
Installation & Maintenance Supplement
Models:
Testing Options: xx=
MAXWELL SUB-ZERO MAINTAINED 184190
CT
Clevertest
ZW
Zoneworks
DATA
Zoneworks DATA
DALI
DALI
Spare Parts:
LLIFEM-PRO-SASAMEMIPRM-xx-FIT
1530230
Battery, 3.3 Volt 5Ah Li-ion
LLIFEM-PRO-SA-CKIT13V300C
PCA: Lifelight Control-SA 300mA CT10142Lx
Important:
It is illegal for anyone, except for a licensed electrician to install or maintain this product. Before
installation, ensure that the electricity supply has been switched off and isolated. Installation must be
carried out in accordance with the relevant Australian and International Standards.
Sammode Lighting Australia Pty Ltd
15 Industrial Avenue
WACOL QLD 4076
Phone: 61 (0) 7 3335 3504
Fax: 61 (0) 7 3335 3522
Designed in Australia to comply with the requirements
of AS2293.3: 2005, AS/NZS CISPR15: 2011
SAMMODE