
Installation
28
7
Installation
7.1
Handling
Fluid sections of great weight and size must be handled
with suitable lifting equipment.
7.2
Connections subsets
These fluid sections are intended to be coupled to
a motor (pneumatic or hydraulic) with compatible
stroke.
It is imperative to comply with an air motor/fluid
section combination provided by SAMES KREMLIN
Make sure that all connections of the pump and
fluid section components - cables, hoses and
pipes - are installed in such a way that they do
not cause people to fall.
Make sure that the order in which the cables,
hoses and pipes are connected is in accordance
with the connection diagram.
Make sure that all cable connectors, hose and
pipe connections are correctly fitted.
Remember that unconnected or incorrectly
connected cables, hoses and pipes can lead to
malfunctions that endanger the safety of
operating personnel.
7.2.1
Fluid supply connection
If the supply pressure is higher than the max.
pressure, it is necessary to install a fluid pressure
regulator the closest possible of the equipment.
Ensure that a short product hose. It reduces
pressure fluctuations and pressure drops.
Make sure that the fluid supply is properly made.
The nominal size of the fitting to be used depends
on the nominal size of the fluid hose.