Disassembly/Re-assembly of the 7000 motor
582108110-EN-indG-Pompe Azur-52C225.docx
72
Preliminary operations
Option
If the pump is equipped with air equipment:
-
turn off the air supply with the valve (1).
Unscrew the air supply hose (2) with a 32 mm spanner,
blocking the air inlet fitting (3) with a 27 mm spanner.
Tools needed
27
32
Summary of Contents for 64350225130000
Page 41: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 41 8 Equipment plans Pump 52C225...
Page 42: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 42 Wall mounted pump...
Page 43: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 43 Pump 52C225 Cart...
Page 44: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 44 Pump 52C225 Cart Hopper...
Page 45: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 45 Fluid section C225...
Page 46: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 46 Motor 7000 Stroke 120...
Page 47: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 47 Air supply...
Page 48: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 48 Filter...
Page 49: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docxx 49 Pump priming kit...
Page 50: ...Equipment plans 582108110 EN indG Pompe Azur 52C225 docx 50 Hopper...
Page 167: ...Pneumatic Wiring 582108110 EN indG Pompe Azur 52C225 docx 167 Indirect air control...
Page 214: ...Spare parts 582108110 EN indG Pompe Azur 52C225 docx 214...
Page 215: ...Spare parts 582108110 EN indG Pompe Azur 52C225 docx 215...