Samcon RoughCam IPP1275 User Manual Download Page 11

 
 
 

 
 

Doc.-ID: 210212-PT10BA-ES-RoughCam IPP1275_en_rev.00.docx, Page 11 of 20 

5.2 

Connection work at the device (terminal box) and fuses 

 

Power supply for the camera (PoE) 

Voltage supply: 

PoE, IEEE 802.3af/802.3at type 1 class 2  

Reference voltage: 

+4 V DC 

Maximum power consumption: 

4.0 W 

Typical power consumption: 

2.5 W 

 
The figure 5.2 illustrates the cable termination of the RoughCam IPP1275.  
 

 

Figure 5-2 RoughCam IPP1275 T10-VA0.1.K1.BOR-N.N-xxx.N-

P

 

 
 

5.2.1 

Direct routing 

 
At the cable end of the sensor unit, the cable is equipped with an RJ12 ethernet plug with 
Power  over  Ethernet  (PoE). The plug  (Fig.  5-2)  is  to  be  connected  to  the  PoE  outlet  of 
the Main Unit (P12 MkII, without pressure tight casing). 
It is suggested connecting the Sensor Unit with the Main Unit prior to powering the Main 
Unit.  If  the  Sensor  Unit  will  be  unplugged  and  then  re-connected,  it  is  possible  that  the 
Main Unit needs to be rebooted. The maximum cable length is 25 m. 
 
 

5.2.2 

Plug assignments (RJ12) of the sensor unit 

 
If the cable of the Sensor Unit needs to be shortened (the cable must not be extended), 
the plug needs to be disassembled professionally. When re-mounting the plug it is man-
datory to observe the correct pin assignment. Usually two strands of the same color code 
(IEC60757) are connected. 
The pin assignment of the SKD04-T.flex is as folllows: 
 
 
 

Summary of Contents for RoughCam IPP1275

Page 1: ...RoughCam IPP1275 User Manual...

Page 2: ...vice terminal box and fuses 11 5 2 1 Direct routing 11 5 2 2 Plug assignments RJ12 of the sensor unit 11 5 2 3 Tests prior to switching on voltage 12 6 Working inside the housing 13 6 1 Preparation fo...

Page 3: ...RoughCam IPP1275 T10 VA0 1 K1 BOR N N xxx N P 11 Table 6 2 Pin assignment of the RJ12 plug SKD04 T flex 12 Figure 6 1 Opening the RoughCam IPP1275 Fig similar 13 Figure 6 2 Structure of the main unit...

Page 4: ...well as outdoor applications It is extreme ly robust and therefore perfect for even the roughest industrial conditions The stainless steel housing allows additional alloys a powder coating or coats of...

Page 5: ...l 1 4404 with small diameter VA2 48mm VA0 1 K1 BOR T11 VA0 1 housing with minimum body length L R 127mm VA0 1 K1 BOR K1 cable gland flange VA0 1 K1 BOR Borosilicate sight glass DIN7080 standard for vi...

Page 6: ...module Jacket colour Green GN similar to RAL 6018 Outside diameter 8 7 0 3 mm Bending radius 8 x Da when installed and 4 x Da after installation Temperature 25 C 80 C during installation 60 C 80 C fi...

Page 7: ...Transport storage temperature 0 C 50 C Ambient temperature EX 20 C 50 C Other technical data see https www samcon eu en products roughcam roughcam ipp1275 Table 2 2 Other technical data Sensor Unit Ex...

Page 8: ...nology shall prevail Before mounting the camera thoroughly check it for any transport damage especially on the housing and cable Instal lation electrical connection and the first start must only be ca...

Page 9: ...n walls Material stainless steel 1 4404 Weight 0 68 kg Dimensions 80 x 100 x 205 mm Pole adapter PMB POLE MOUNT EXCAM VA1 x Pole apter for VA wall mount Material stainless steel 1 4404 Suitable for po...

Page 10: ...ient The user is NOT authorised to do electrical connection procedures inside the pressure resistant enclosure 5 1 Potential equalization Figure 5 1 RoughCam IPP1275 Potential equalization Potential e...

Page 11: ...over Ethernet PoE The plug Fig 5 2 is to be connected to the PoE outlet of the Main Unit P12 MkII without pressure tight casing It is suggested connecting the Sensor Unit with the Main Unit prior to p...

Page 12: ...hat the cable shield is grounded on side of the terminal block The maximum cable length between camera and terminal box is 25 m 5 2 3 Tests prior to switching on voltage Attention Prior to starting th...

Page 13: ...E 243 chemical basis is dimethacrylate ester applied to prevent the bolted con nection from unintentional loosening because of impacts and vibrations and to seal them tightly It is not permitted for t...

Page 14: ...d or its state is uncontrollable the reset should be performed manually To do so proceed as follows 1 Disconnect the camera installation module Axis P1275 from the power supply 2 Press and hold the co...

Page 15: ...ing Dismantled screw locks spring washers DIN 127A must be used again The GYLON gasket must be used in undamaged condition according to the flange hole pattern and placed between the flange and the hu...

Page 16: ...ase the applicable settings have to be carried out inside the menu System Options Advanced Plain Config User root Password root 7 1 Browser Support A list of the currently supported web browsers opera...

Page 17: ...ices in po tentially explosive atmospheres must be adhered to The required maintenance intervals are specific to the individual devices The operating company has to determine these intervals depending...

Page 18: ...ings 3D models certificates and other information are available in the download area of the product page on our website https www samcon eu en products roughcam roughcam ipp1275 If you wish additional...

Page 19: ...Doc ID 210212 PT10BA ES RoughCam IPP1275_en_rev 00 docx Page 19 of 20 12 Notes...

Page 20: ...Schillerstrasse 17 35102 Lohra Altenvers Germany www samcon eu info samcon eu Phone 49 6426 9231 0 fax 31...

Reviews: