![Salus PCSol 201 Installation And Operation Manual Download Page 41](http://html1.mh-extra.com/html/salus/pcsol-201/pcsol-201_installation-and-operation-manual_3644550041.webp)
41
17.8.
Solar Application scheme H
Loading of DHW reservoir from two sets of solar collectors oriented in two directions.
Fig. 17.8 Application scheme H
Installation recommendations
1.
For correct operation the system must be equipped with return valves mounted on the solar panel
outlets. In other case, starting circuit of
A
collector will affect operation of
B
collector sensor,
causing poor performance.
2.
For the controller to count heat output, install additional CT6 sensor on DHW container lower pipe
coil and connect it to
T4
input. The sensor must be installed possibly near the connector pipe.
3.
Connect the circulation pump to the
H
output via the relay. It is necessary to use a relay type
6VDC
RM85-2021-35-1006
.
Setting recommendations
4.
With the use of additional sensor
T4
, the controller allows effective controlling of
P2
pump that will
be started, when the temperature of return from exchanger reaches
dTP2
value.
Mains 230~
S
u
p
p
ly
L
S
u
p
p
ly
N
Pu
m
p
P1
[N
]
Pu
m
p
P1
[L
]
Pu
m
p
P2
[L
]
Pu
m
p
P2
[N
]
S
e
n
s
or
T
1
[+]
S
e
n
s
or
T
1
[-
]
S
e
n
s
or
T
2
[+]
S
e
n
s
or
T
2
[-
]
S
e
n
s
or
T
3
[+]
S
e
n
s
or
T
3
[-
]
S
e
n
s
or
T
4
[+]
S
e
n
s
or
T
4
[-
]
Ou
tp
u
t
H
[+]
Ou
tp
u
t
H
[
-]
Summary of Contents for PCSol 201
Page 2: ......
Page 6: ......
Page 7: ...OPERATING MANUAL PCSol 201 ...
Page 27: ...INSTALLATION MANUAL PCSol 201 ...
Page 54: ...54 ...
Page 55: ......
Page 56: ...SALUS Controls Made in Poland ...