22
9) Completed.
Attention: when the splicing loss or the altitude change is big. Electrode stabilize and ARC
calibration must be executed.
4.8 Magnification function of the screen
Users can double click the screen to magnify the monitor so as to inspect the
splicing crack and estimate the splicing state.