
3 PERIODICAL MAINTENANCE
– 70 –
⑪
Fuel sedimenter
Check the float level. If it comes up to
the level mark, open the drain cock at
the bottom and drain water.
NOTE: After purchasing a new
machine, drain water 50 hours
after the initial operation.
⑭
Brake
When the engine is completely stopped, step on the brake
pedal by two or three times. After this, while forcefully
keep stepping on the brake pedal for more than five
seconds, check the gap between the brake pedal and the
floor panel by rulers. It is appropriate if the gap between
the brake pedal and floor panel is 100 mm.
Also check that each bolt is not loose, the motion of the
brake pedal is smooth, and the brake pedal is properly
resilient when stepping it on.
3) Every 250 hours
⑫
Rubber dampers
Check the rubber blocks for cracks, and their mounting
bolts for looseness.
Summary of Contents for SV204 Series
Page 2: ......
Page 6: ......
Page 70: ...3 PERIODICAL MAINTENANCE 64 3 3 Periodical Maintenance Points 1 SV204D SV204T SV204TF ...
Page 71: ...3 PERIODICAL MAINTENANCE 65 2 SV204TB ...
Page 89: ...3 PERIODICAL MAINTENANCE 83 ...
Page 98: ......
Page 100: ......