
2 OPERATION
– 53 –
2.8.2 Self-propelling
1) Engage the trailer brake and chock its wheels. Fix the ramps so that the machine and
trailer are completely aligned.
☆
The angle between the ramps and ground must be less
than 15 degrees.
☆
Leave a proper space between the ramps according to
the width of the roller drum.
2) Decide the correct direction of run and conduct loading
or unloading at low speed.
For loading, run forward at low speed.
For unloading, run backward at low speed.
3) Locate the machine correctly on the trailer.
2.9 After Loading the Machine
When the machine has been located properly on the trailer, tie it down as follows:
1) Press the parking brake switch to apply the parking brake. Place chocks under the drums
to prevent movement.
2) Fix the machine with ropes tied at the front and rear towing hook holes. Particularly, pay
attention to sidewise skidding.
2.10 Transportation
WARNING
To decide the transporting route, check the width of the road, height and weight
(including the roller) of the trailer. Obey relevant regulations.
Summary of Contents for SV204 Series
Page 2: ......
Page 6: ......
Page 70: ...3 PERIODICAL MAINTENANCE 64 3 3 Periodical Maintenance Points 1 SV204D SV204T SV204TF ...
Page 71: ...3 PERIODICAL MAINTENANCE 65 2 SV204TB ...
Page 89: ...3 PERIODICAL MAINTENANCE 83 ...
Page 98: ......
Page 100: ......