background image

 
 

 

 

 

 

INDEX 

 

Page 

 
I – General   

 

I.1 – Introduction 

 

I.2 – Materials 

 

I.3 – Operation description 

 

I.4 – Pump Data 

 
II – Quick Checklist 

 

II.1 – Shipment 

 

II.2 – Reception 

 
III – Installation and operation 

 

III.1 – Testing 

 

III.2 – Set up 

 

III.3 – Connections 

 

 

III.3.1 – Air/nitrogen connections 

 

 

III.3.2 – Fluid connections 

 

III.4 – Initial tests and adjustments 

 
IV – Applications 

 

IV.1 – Chemical compatibility 

 

IV.2 – Temperature range 

 

IV.3 – Cleaning 

 

IV.4– Single stroke adjustment 

 

IV.5 – Limitations of use 

 
V –     Trouble shooting 

 

 

 
VI – Warranty, safety 

 
 
 
Appendix: 

 

 

 

Section view  

 

 

Dimensions 

 

 

Pneumatic wiring diagram  

 

 

 

 
 
 

Summary of Contents for MDP 50

Page 1: ...INPERFORMANCE SAINT GOBAINPERFORMANCEPLASTICS PLASTICS FRANCE EADAC DES BERTHILLIERS 7301 Orangewood Avenue F 71850 CHARNAY LES MACON Garden Grove CA 92841 Tel 33 0 3 85 20 27 00 Tel 1 714 630 5818 Fax 33 0 3 85 29 18 48 Fax 1 714 688 2614 www microelectronics saint gobain com ...

Page 2: ...III 1 Testing III 2 Set up III 3 Connections III 3 1 Air nitrogen connections III 3 2 Fluid connections III 4 Initial tests and adjustments IV Applications 3 IV 1 Chemical compatibility IV 2 Temperature range IV 3 Cleaning IV 4 Single stroke adjustment IV 5 Limitations of use V Trouble shooting 5 VI Warranty safety 5 Appendix 7 Section view Dimensions Pneumatic wiring diagram ...

Page 3: ...he top of the pump The pump speed varies with operating conditions air pressure viscosity density I 4 Pump data The main characteristics of the MPD 50 pump are Repeatability 1 Dispense volume per shot 0 to 0 5 mL Dispense speed 0 to 0 5 mL s max Delivery pressure 4 3 psig 0 3 bar max at 70 psig 4 8 bar air actuation Air nitrogen pressure 50 70 psig 3 4 4 8 bar Suction height 2 feet 0 6m based on w...

Page 4: ...l valve is to control the speed of the suction cycle The integrated check valve is for a quick release of the pressure during the discharge cycle 3 2 way valve is necessary for the on off cycle of the pump When the 3 2 valve is actuated it is the suction cycle When the 3 2 valve is not actuated it is the discharge cycle Pressure regulator is to setup the right pressure Filter If the air nitrogen o...

Page 5: ...ge line It is recommended to adjust the stem to the maximum stroke 3 Check the delivered volume of liquid with a calibrated beaker test tube or a precision balance to calculate the single stroke 4 If unit stroke is not as required screw on the adjustable stem to reduce the stroke or unscrew it to increase the volume 5 Repeat the stroke until you get the required volume of liquid per shot 6 When th...

Page 6: ...e year from delivery date SGPPL is not responsible for damage to its products through improper installation maintenance use or attempts to operate them beyond their mechanical capability intentionally or otherwise or for unauthorized repair SGPPL shall not be liable for any indirect special incidental or consequential damages resulting from the use failure or malfunction of any product Safety hint...

Page 7: ...ted When the pump is handling liquids higher than 122 F 50 C avoid direct contact with the pump or piping system Use appropriate hand protection if handling of the pump or piping is necessary Always wear protective gear goggles face shield acid resistant gloves etc when removing or servicing the pump In addition flush the pump completely with di water prior to any service or maintenance Ensure suc...

Page 8: ...7 7 ...

Reviews: