Site technical documentation B2005
CHAPTER 4 - TESTS AND CHECKS
4.1 ABOUT TESTS
Tests and checks are made after the troubleshooting procedures (chapter 3) and before the
maintenance procedures (chapter 5).
They are broken down into modules and are sorted by types of confirmed faults. The user must be
equipped with special test tools in order to carry out the tests.
4.2 TEST TOOLS
The references of SAGEM tools, listed hereafter, are given in Appendix 1 : Composition table.
The following test tools are necessary :
-the ARC downloading kit, including the test case provided with:
·the data cable (to PC),
·the retrofit cable,
·the mains power supply module.
·Retrofit adapter
-the radio test bench, provided with:
·SIM card of test.
·B2005 calibration tool
·Adjustable regulate power supply 0-15V / 4A
·Wavetek 4107
-CADEX C7000 / C7200 / ASTRATEK with myC3-2 adapter
·Charger test kit
·Voltmeter (minimum impedance : 20 KW per Volt in DC)
·Ampermiter
-an IMEI labels printing station, including :
· Printer,
· Roll of labels,
· Connecting cable for PC (parallel printer cable),
· Printing software,
4.3 INSTALLING ON A WORKSTATION
4.3.1 Minimum required configuration
The minimum configuration of the workstation is :
- Processor 1Ghz,
- 128 Mbytes of RAM,
- Windows 2000, Windows XP,
- 2.1 Gbytes hard disk (1 Gbytes available),
- 1 parallel port and 2 serials port.
- USB port.
- Network card, sound card.
REF MTB DTS 2- Indice A - December 21 2005
Page 4-1