102
Tying
Unless stated otherwise, all dimensions are given in mm.
Preparing MR Tie Rod and MANTO G3 Front Tie Nut
The MR Tie Rod, MANTO G3 Front Tie Nut, Tie Sleeve and Sealing Cones form a unit
that is operated from the closing side formwork.
Step 3
Cut the Tie Sleeve to the required length. The length of the Tie Sleeve is the wall thick-
ness minus 20 mm.
10
10
Wall thickness
Sealing Cone (code:607122)
Tie Sleeve
Step 4
Screw the MR Tie Rod into the MANTO G3 Front Tie Nut.
Step 5
Place the Tie Sleeve with the Sealing Cones on the Tie Rod.
Step 6
Unscrew the MR Tie Rod until the end of the Tie Sleeve is positioned at the tie rod
marking.
Attaching MR Tie Rod and MANTO G3 Front Tie Nut to Advancing Side
Step 1
Remove the plugs from the plastic inserts in the tie holes to be used.
Step 2
Close unused plastic inserts with plugs.
Step 3
Set up the formwork panels.
Summary of Contents for Huennebeck MANTO G3
Page 1: ...MANTO Large frame panel formwork User guide...
Page 9: ...9 Unless stated otherwise all dimensions are given in mm MANTO...
Page 61: ...61 Unless stated otherwise all dimensions are given in mm MANTO MANTO G3 M MANTO G3 M...
Page 219: ...219 Unless stated otherwise all dimensions are given in mm MANTO...