APPENDIX 1 

 CONCRETE INJECTION MORTAR  

 

POSITIONING OF CONCRETE ANCHOR

 - The Concrete Anchor must be in a position easily and safely reached from a 

safe access point. Concrete anchor should not be positioned close to an edge, minimum distance 150mm. 
Minimum concrete thickness 150mm.  

 

LOCATING THE REINFORCING STEEL BAR (REO BAR) IN THE CONCRETE

 - Use 

Digital metal detector (Example: 

BOSCH DMO 10) 

to locate the Reo bar in the concrete when positioning the Concrete Anchor. This ensures reo bars 

are avoided when drilling.  

 

DRILLING THE HOLE

 - Drill a hole to a depth and width as suggested in below table.  

 

PREPARING THE HOLE

 - The hole must be moisture and dust free. Remove dust using compressed air, small brush, 

and vacuum cleaner.  

 

INSTALLING THE CONCRETE ANCHOR

 - Recommended chemical is 

Fischer FIS-V

 

Prior to anchor installation, refer to installation procedure for individual anchor product and check chemical 
is within expiry date.  

 

The injection cartridge is for use with a standard caulking gun.  

 

Partially used cartridges can be re-used by changing the mixing nozzle. 

 

The entire surface of the anchors embedded section must be within the concrete and shall use sufficient 
adhesive mortar as specified in the table below. 

 

PRODUCT CODE: CON-CHEM-FISV.300 

Product Code 

Description 

Qty 

 

CON-CHEM-FISV.300.01 

Injection Mortar FIS V Cartridge 300ml 

 

CON-CHEM-FISMR 

Static Mixer FIS MR 

 

 

FIS V 300T: INJECTION MORTAR 

APPLICATION 

ANCHOR 

DIAMETER(mm) 

DRILL HOLE 

DIAMETER(mm) 

DRILL HOLE 

DEPTH(mm) 

MORTAR/ 

FIXING(ml) 

NO# OF FIXING/ 

CARTRIDGE 

DonutLink FrogLine 

16 

18 

95 

15 

20 

Concrete Insert 

24

 

28

 

90 

40 

7.5 

One Piece Eyebolt 

16

 

18

 

90 

15 

20 

WindowLink 

53&25

 

55&28

 

20&122 

60 

SwiveLink 

24

 

28

 

90 

40 

7.5 

M12x160 Anchor Rod 

12 

14 

115 

10 

30 

M16x160 Anchor Rod 

16 

18 

115 

15 

20 

X-Rail 

12 

14 

95 

10 

30 

 

CURING TIME FIS V 

Cartridge Temperature (mortar) 

Gelling Time 

Temperature at anchoring base 

Curing Time 

 

 

5⁰C 

± 0⁰C

 

24 hours 

+ 0⁰C 

+ 5⁰C

 

13 minutes 

± 0⁰C 

+ 5⁰C

 

3 hours 

+ 5⁰C 

+ 10⁰C

 

9 minutes 

+ 5⁰C 

+ 10⁰C

 

90 minutes 

+ 10⁰C 

+ 20⁰C

 

5 minutes 

+ 10⁰C 

+ 20⁰C

 

60 minutes 

+ 20⁰C 

+ 30⁰C

 

4 minutes 

+ 20⁰C 

+ 30⁰C

 

45 minutes 

+ 30⁰C 

+ 40⁰C

 

2 minutes 

+ 30⁰C 

+ 40⁰C

 

35 minutes 

The above times apply from the moment of contact between resin and hardener in the static mixer.  
For installation, the cartridge temperature must be at least +5

⁰C. For longer installation times, ie when interruptions occur in 

work, the mixer should be replaced. 

 

Testing for concrete mounted anchor. 

To comply with current Standards each Concrete unit must be tested after installation. Allow required curing time 
as specified in above table before testing. Test consists of pull out force to 50% of design load of anchorage.  

Note: Drilled-in anchorages such as friction and glued-in anchorages shall be placed so that the shear load is at 
least twice the tension load. For collared eyebolts this translates to a pull at an angle not exceeding 20 degrees 
to the surface in which the bolt is installed. 

 

 

Summary of Contents for Classic Tuff-Post Concrete Lifeline

Page 1: ...SafetyLink s installation handbook using only products supplied by SafetyLink Pty Ltd Failure to follow all warnings and instructions may result in serious injury or death Asia Pacific The Americas 61...

Page 2: ...OST 11 LIFELINE SYSTEM INFORMATION 12 INSTALLATION CABLE TENSIONERS TERMINATION FITTINGS 12 TIGHTENING ASSEMBLY TORQUE SETTINGS FOR SWAGELESS TERMINALS 12 APPENDIX A SWAGELESS SWAGED FITTINGS INSTALLA...

Page 3: ...ponents use nickel anti seize or similar boundary layer lubricant Recommended waterproofing for roof tiles Sika Flex Co Polymer Sealant Recommended waterproofing for metal roof Silicone Sealant Neutra...

Page 4: ...check the 16mm bolt securing the FrogLine Base to the Tuff Post for rigidity and tightness If the Bolt can turn in the anticlockwise direction it will require attention Visually inspect the attachment...

Page 5: ...on by replacement for a period of 1 one year from the date of shipment This limited warranty applies provided that a defects have arisen solely from faulty materials or workmanship b the Products have...

Page 6: ...316 SS 1 TUFF POST300 TUFF POST 300mm 316 SS 1 CON M12x160 Anchor Rod M12X160 M12 Nut M12 Spring Washer M12 Washer 316 SS 4 TUFF POST INTERMEDIATE EXT ANCHOR PRODUCT CODE STAT FROGTUFF008C 300 PRODUC...

Page 7: ...316 SS 1 TUFF POST600 TUFF POST 600mm 316 SS 1 CON M16x160 Anchor Rod M16x160 M12 Nut M12 Spring Washer M12 Washer 316 SS 4 TUFF POST INTERMEDIATE EXT ANCHOR PRODUCT CODE STAT FROGTUFF008C 600 PRODUC...

Page 8: ...0mm Minimum concrete grade MPA32 Minimum anchor rod embedment 115mm Recommended chemical anchor Fischer FIS V as per Fischer Product Supplement Data sheets If any doubt exists with the strength of the...

Page 9: ...sts is embedded in the concrete and chemical adhesive gel Remove any chemical adhesive gel that has been displaced from the anchor hole during installation Allow chemical adhesive gel to cure to full...

Page 10: ...ssment STEP 3 Mark drill bit or set drill depth to 120mm this enables easy detection of correct length STEP 4 Drill a 14mm or 18mm hole into the concrete minimum 115mm embedment into structure concret...

Page 11: ...TINGS Note It is always recommended to install at least one intermediate in overhead lifeline system when SRL s are used FITTING THE HEIGHT SAFETY SYSTEM TO THE TUFF POST FOLLOW BELOW STEPS FOR END IN...

Page 12: ...manual maximum distance between End Intermediate and Corner Anchors is 10 metres 4 Connect Swaged Swageless Tensioner with Tension Indicator to FrogLine End Anchor top connection point Do not attach T...

Page 13: ...ace between the jaws 3 Place the brass pressure ring on the end of the cable Make sure that the distance from the pressure ring to the end of the cable is 5 8mm 4 Slide the jaw housing over the jaws 5...

Page 14: ...1x19 7x19 and 7x7 cable The measurement should be taken with Vernier Callipers to ensure accuracy If your measurements are outside the acceptable tolerance range this can be a sign of either a loss of...

Page 15: ...own below image Load anchorage point to 7 5kN refer pull test device instructions Ensure energy absorbing regions of the anchor system are not loaded during this test Check concrete and chemical adhes...

Page 16: ...ption MAKE SURE YOU ARE SAFE AT ALL TIMES WHILST ATTACHING OR DETACHING FROM THE FROGLINE LIFELINE SYSTEM A FALL RESCUE PLAN SHOULD BE DEVELOPED PRIOR TO USING SAFETYLINK EQUIPMENT ENSURE YOU USE THE...

Page 17: ...300 01 Injection Mortar FIS V Cartridge 300ml 1 CON CHEM FISMR Static Mixer FIS MR 2 FIS V 300T INJECTION MORTAR APPLICATION ANCHOR DIAMETER mm DRILL HOLE DIAMETER mm DRILL HOLE DEPTH mm MORTAR FIXING...

Page 18: ...must only be installed and used by competent people with relevant current height safety qualifications SAFETYLINK HEIGHT SAFETY SYSTEMS MUST ONLY BE INSTALLED AS PER OUR INSTALLATION GUIDES TO STRUCTU...

Page 19: ...owing complete access to your roof Detailed comprehensive documentation provided e g installation guides testing results product sheets should be provided SafetyLink can also provide you with a qualif...

Page 20: ...FALL OR SHOWS A DEFECT Any piece of equipment including both personal and permanently installed items which has been used to arrest a fall or which shows any defect during operator or periodic inspect...

Reviews: