background image

SAFEGREASE 2 
MAXILUBE 
 

 

MMAX1DEN.doc 

30.05.2005   Rev. 1D 

6 (9) 

 

15.  Clean the grease filter and filter cartridge and replace them when necessary. 

16.  Switch on the power to the pumping center. Reset possible low level alarm by pressing the 

"Alarm acknowledgement" -button on the control unit. 

17.  Make a pumping center operation test run by pressing "Extra lubrication" button on the 

control unit. 

3.3   Manual operation 

SAFEGREASE 2 -system can be operated by a manual procedure in the event of an electrical 
malfunction. Pressurize the system by using the manual control screws of the pumping center's 
solenoid valve group. 
 

If the system is designed with shut-off valves, open the shut-off valve of the channel to be 
pressurized before the pressurization of the piping so that the lubricant can be distributed to the 
lubrication points after the shut-off valve. 

See SAFEGREASE 2 / CLV-2 shut-off valve

.

 

 

Caution 

Ensure that the pumping center is turned off during manual operation. 

 

One lubrication cycle is performed as follows: 

1.  Turn the manual control screw of solenoid valve MV1 90° clockwise so that the directional 

valve directs pressurization to line 1. 

2.  Turn the manual control screw of solenoid valve MV3 also 90° clockwise, after which the 

pump starts. 

3.  When the pressure reading in line 1 pressure gauge at the pumping center rises to 200-

250 bar (3000–3600 psi), turn the manual control screw of solenoid valve MV3 to its initial 
position (90° counter-clockwise) to stop the pump. 

4.  Let the pressure act in line 1 for about 2 minutes. Maintain the pressure so that all the 

dosers have sufficient time to operate. 

5.  Turn the manual control screw of solenoid valve MV1 to its initial position (90° counter-

clockwise) to release pressure from line 1. 

6.  Line 2 can be pressurized after pressure reading has fallen under 50 bar (700 psi) in the 

pressure gauge of the line 1 pressure control unit. 

7.  Turn the manual control screw of solenoid valve MV2 90° clockwise so that the directional 

valve directs pressurization to line 2. 

8.  Turn the manual control screw of solenoid valve MV3 also 90° clockwise, after which the 

pump starts. 

9.  When the pressure reading in line 2 pressure gauge at the pumping center rises to 200-

250 bar (3000–3600 psi), turn the manual control screw of solenoid valve MV3 to its initial 
position (90° counter-clockwise) to stop the pump. 

10.  Let the pressure act in line 2 for about 2 minutes. Maintain the pressure so that all the 

dosers have sufficient time to operate. 

11.  Turn the manual control screw of solenoid valve MV2 to its initial position (90° counter-

clockwise) to release pressure from line 2. 

12.  Line 1 can be pressurized again after pressure reading has fallen under 50 bar (700 psi) in 

the pressure gauge of line 2 pressure control unit 

13.  Repeat the steps 1–5. 

Summary of Contents for MAXILUBE 2

Page 1: ...STA 1 3 OPERATION 2 3 1 Start up 2 3 1 1 Maxilube ECO 2 3 1 2 Maxilube STA 3 3 2 Changing the lubricant barrel 4 3 2 1 Maxilube ECO 4 3 2 2 Maxilube STA 5 3 3 Manual operation 6 4 SETTINGS 7 5 TECHNIC...

Page 2: ...vered with the following additional pieces of equipment barrel lid pos 13 follower plate pos 14 barrel low level switch pos 15 and grease filter pos 16 Note The follower plate is not used with grease...

Page 3: ...id 4 on top of the lubricant barrel Fasten the lid with wing screws on the lubricant barrel 5 Place the pump 5 through the lid into the follower plate central unit Ensure that the pump is attached to...

Page 4: ...n and cause damage when reaching the lubrication point 2 Check the state of the lubricant barrel 1 Damages on the surface prevent the lowering of the follower plate 2 3 Remove the lid from the barrel...

Page 5: ...ntrol device The maximum pressure of the pumping center should be set approximately 20 higher than the pressure by which the pressure control unit acknowledgement pressure is reached For example if th...

Page 6: ...TA Note Numbers in brackets are part numbers of drawing 461993B 1 Ensure that the surroundings of the pumping center are clean Impurities in the system prevent trouble free operation and cause damage...

Page 7: ...ssure gauge at the pumping center rises to 200 250 bar 3000 3600 psi turn the manual control screw of solenoid valve MV3 to its initial position 90 counter clockwise to stop the pump 4 Let the pressur...

Page 8: ...350 bar 2900 5000 psi 5 TECHNICAL SPECIFICATION 5 1 Technical specifications Quantity Value Unit Description t 10 50 14 122 C F Operation temperature p 4 7 60 100 bar psi Pressure range for pneumatic...

Page 9: ...is used 230 Power input 230 V Control voltage if external control is used D IF105 User interface IF 105 X External control E R Connections R threads U Connections NPT threads F A Options LG ind spray...

Page 10: ...lid set assembly drawing 361189A See MAX LIDSET 1 1 ECO 590 lid set assembly drawing 361188A 6 2 Maxilube STA See MAX LIDSET 1 4 STA 370 lid set assembly drawing 361191A See MAX LIDSET 1 1 STA 590 li...

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Reviews: