Page 1: ......
Page 2: ...1 4 5 UXV 211 ASSEMBLY INSTRUCTIONS PACKAGING CONTENTS CONTENTS OVERVIEW 1 Rear Rotation Assembly Qty 1 2 Front Rotation Assembly Qty 1 ELR 8112 Tele scope handle ELR 8082 Adj Z post ELR 7225 ELR 815...
Page 3: ...ht Hand 50 00 HKT 8102 Rotation Hardware Kit Mounting Hardware 5 Front Drive Shaft Qty 1 B Version 35 75 4 Connecting Bar Qty 1 48 00 Anti Seize 1X Lubricant 1X Clevis Pin 1X Cotter Pin 1X M8 x 50MM 4...
Page 4: ...0 96 00 84 00 72 00 Rear Lower Front Lower 3 50 3 50 UTILITY BODY MOUNTING 6 00 8 00 Ft Drill holes into the Service Body mounting location according to dimensions shown 0 1 0 4 Torque to 90 in lbs 0...
Page 5: ...O LQIR SULPHGHVLJQ QHW ZZZ SULPHGHVLJQ QHW 70 35 0 6 1 3527 7 21 25 025 2 7 2 2 1 3 7 17 12 V 1 27 5 3 7 176 3 1 1 5 3 1 2 6 4 7 5 RIGHT ROTATION ASSEMBLY SEQUENCE UXV 211 ASSEMBLY INSTRUCTIONS RIGHT...
Page 6: ...HVLJQ QHW ZZZ SULPHGHVLJQ QHW 70 35 0 6 1 3527 7 21 25 025 2 7 2 2 1 3 7 17 12 V 1 27 5 3 7 176 3 1 1 6 UXV 211 ASSEMBLY INSTRUCTIONS RIGHT SIDE ROTATION CYLINDER HARDWARE CONNECTING BAR 2 1 2 2 3 1 3...
Page 7: ...de down when operating the loaded Ladder Rack 6 CYLINDER ADJUSTMENT 7 1 7 2 UXV 211 ASSEMBLY INSTRUCTIONS RIGHT SIDE ROTATION For additional information regarding your UXV 211 Ladder Rack please visit...
Page 8: ...USAM UXV211 US01 Rev B 1116...