Power Cord Connection
Turn the open-close knob clockwise in the back of control box, and pump cover
opens and can see the space between the covers. Then insert the irrigation tube
into the space.
Turn the knob counter clockwise ( ) until closing pump cover.
I
nsert the power cord into the power socket in the
back of control box.
Irrigation Tube Connection
22
Summary of Contents for Implant XCUBE
Page 1: ...INSTRUCTION MANUAL www saeshin com...
Page 2: ......
Page 4: ...2 15 I BF IEC 60529 IPX 0 IPX 8 1...
Page 6: ...AC 100 120V 220 240V 3...
Page 8: ...LCD ISO 1797 1 2 3 4 5...
Page 12: ...9 Y 1 8 2 9 BLDC 3 10 4 AC 11 5 12 6 A 13 7 14 15 1 8 2 9 3 10 4 11 5 12 6 13 7 14 15 No No Y...
Page 14: ...11...
Page 18: ...1 0 4 0 4 75ml min 2 1 9 9 1 3 4 5 rpm LCD 15...
Page 20: ...1 1 2 3 4 1 5 17...
Page 22: ...19...
Page 24: ...21...
Page 26: ...6 Bottle O X 23...
Page 28: ...Y Y 25...
Page 30: ...3 4 5 2 6 7 2 1 9 0 27 1 1...
Page 32: ...X CUBE 9 ex LCD Warning Torque LIMIT Warning Motor Connect Check Warning Foot Switch Check 29...
Page 34: ...1 10 20 3 10 3 3 70 30 31...
Page 36: ...2 132 4 30 250 Y 1 132 3 1 1 2 3 4 5 2 1 2 3 3 1 33 132 4 30...
Page 40: ...1 C 10 30 10 80 700 1 060 20 60 10 90 500 1 060 hPa C hPa 37...
Page 44: ...132 EC BF SN CE 41 1639 NON STERILE...
Page 46: ...43 MEMO...
Page 47: ...44 MEMO...