SOUTHERN AVIONICS COMPANY
SE Series Installation and Setup
7-8
Operational Checks
7.9.11
Key in the desired power level for the site and press
ENTER
to store and activate that level. In a
few seconds the power output level selected should register on the meter and voltage on the PA
meter should be indicated.
7.9.12
Verify the output RF power level measured at the dummy load agrees (within 5%) with the value
displayed in the Transmitter 2 section.
7.10 Transmitter #2 Modulation Level Check
7.10.1
Press the
MOD LEVEL
key to open the
MODULATION SETTING
menu, as shown below.
Press the
MOD LEVEL
key repeatedly to clear the modulation level box.
Enter 95% modulation and press ENTER to store that level.
---------- RF POWER SETTING ----------
POWER should be between 0 and 125.
Enter RF Power Level: [100] watts
---------- MODULATION SETTING ---------
MOD Level should be between 0% and 100%.
Enter Modulation Level: [ 95]%