Assembly and operating manual
rtv.sabaj.pl/en/home/
12. Screw the control box holder to the wall or ceiling at a convenient distance from the lift. Put
the control box on the holder and tighten the screws (fig. 12).
Device operating
The control box supplied with the set is pre-programmed for the maximum ranges of the lift
movement.
13. Control panel
14.
Connecting the controller:
connect cable from the lift with the control box.
Then plug in
the main socket. The power supply is signaled by lighting the indicator
POWER
(green).
Then the controller carries out the procedure "self-test" indicating this by three sound
signals and flashing lights "SETUP" (red). After finish this operation the control box is ready
to work. Pressing any button is confirmed by a short beep sound.
fig. 12
fig. 13