7
ASSEMBLY INSTRUCTIONS
Tools Required
1.
Ratchet handle
2.
9/16” deep socket
3.
9/16” wrench
4.
5/8” wrench
5.
3/4" socket or wrench
6.
7/32” allen wrench
7.
Phillips head screwdriver
8.
1/2" (13 mm) concrete drill bit
9.
1/4" (6 mm) drill bit
10.
Power drill
11.
PVC pipe primer & glue
12.
Anti-seize
13.
Saw to cut PVC pipe
14.
Knife
15.
Level
16.
Teflon tape (plumbers tape)
17.
Silicone sealant
18.
Pistol-grip clamp (optional)
Gasket Installation
•
Most of the gasket material has been installed at the factory, however additional gasket has been
provided in case any gasket has fallen off during shipping. If gasket installation is required, follow
the instructions below. The gasket on the face of the ladder is not installed in the factory, but
detailed instructions are provided in step 8 on page 10.
•
Apply gasket (PN 8-532) in the required locations as shown in the figures below.
•
Place gasket along the section to determine the length needed.
•
Cut gasket to appropriate length, within the width of the runway only, do not include the shoulder.
•
Remove backing and adhere gasket to slide.
•
All gaskets below are applied as shown in the gasket section detail (see step 8 for further details
on installing the ladder gasket, PN 8-531)
FIGURE B
NOTE:
BE SURE TO APPLY ANTI-SEIZE TO ALL
FASTENERS TO PREVENT GALLING.
NOTE:
Use pistol-grip clamps as
necessary to align the molded parts.
Summary of Contents for heliX2
Page 19: ...A APPENDIX A...
Page 20: ...B APPENDIX B...