VDR-100G2/G2S Operation User Manual
66
RUT-UM-02-002_Rev. 2.0
7.4
Update Service History Log
Any time preventative or corrective maintenance has been carried out on the VDR/VSDR a new entry
should be added to the Update Service History Log (see Table 7-4: Update Service History Log below).
A complete record of the Date, Service\Fault Description, Service Supplier and Ship’s Representative
Signature must be documented in the log for each entry in order for the information to be valid.
Summary of Contents for VDR-100G2
Page 2: ......
Page 4: ...This page is intentionally blank...
Page 6: ...This page is intentionally blank...
Page 36: ...VDR 100G2 G2S Operation User Manual 26 RUT UM 02 002_Rev 2 0 This page is intentionally blank...
Page 44: ...VDR 100G2 G2S Operation User Manual 34 RUT UM 02 002_Rev 2 0 This page is intentionally blank...
Page 50: ...VDR 100G2 G2S Operation User Manual 40 RUT UM 02 002_Rev 2 0 This page is intentionally blank...
Page 78: ...Inside back cover...